hit counter script

Initial Commissioning - Siemens simatic hmi op7 Equipment Manual

Operator panel
Hide thumbs Also See for simatic hmi op7:
Table of Contents

Advertisement

15.1

Initial commissioning

Procedure
Equipment Manual OP7, OP17
Release 04/99
Initial commissioning comprises loading the firmware required to enable the
OP to function and the configuration onto the OP. You do this as follows:
Step
1
Switch on the OP's power supply.
Since a configuration has not yet been loaded at this point in
time, the OP automatically switches to download mode and waits
for data to be downloaded from the configuration computer
(PC/PU).
You are not able to operate the OP in this mode.
2
Using a suitable standard cable, connect the configuration com-
puter to the interface of the OP:
IF1A for OP7
IF2 for OP17
Start the download operation to the OP on the PC or PU.
3
The OP checks the link to the PC or PU. If a link is not available
or if it is not functioning properly, the OP issues a corresponding
error message.
If the link is in order, downloading of the configuration from the
PC or PU is initiated to the OP.
As long as data are not being downloaded to the OP, you
can cancel Download mode by pressing
1)
Switch on the power supply before you connect the OP to the configuration computer.
If you don't, the internal polarity reversal protection function of the OP can be rendered
ineffective is the polarity of the power supply is reversed.
Note
Please refer to the ProTool/Lite User's Guide for the ProTool settings
required for downloading.
Once the configuration has been successfully downloaded, the OP runs up
again. If a start screen has been defined in the configuration, it is opened. If a
start screen has not been defined, the OP displays the standby message.
Procedure
1)
ESC
15-3

Advertisement

Table of Contents
loading

Table of Contents

Save PDF