Commissioning

Diagrammatic
representation
Initial Commissioning
No configuration/firmware
exists on the OP.
Download configuration data to OP
ProTool
Figure 15-1 Commissioning Flowchart
Equipment Manual OP7, OP17
Release 04/99
The commissioning guide which follows explains the different steps that
have to be taken to commission the OP. Figure 15-1 shows the most impor-
tant steps for initial commissioning, recommissioning and normal operation
of the OP.
Recommissioning
The OP already contains a
configuration but you want to
change the configuration or
use a new one.
Switch on power supply of the OP
Switch the OP to download mode
during the startup phase
(see chapter 15.2).
COM1/2
Start screen or standby message
Normal Operation
The OP is operated with the
loaded configuration.
OP
15
15-1