Commissioning
4.2 Commissioning with BOP-2 operator panel
4.2.3
Additional settings
4.2.3.1
Operating the inverter with the BOP-2
Status display once the power supply for the inverter has been switched on.
1)
Figure 4-1
Menu of the BOP-2
Figure 4-2
36
Other keys and symbols of the BOP-2
SINAMICS G120C converter
Getting Started, 04/2014, FW V4.7, A5E34264105B AA