Preparing for use
Good planning and preparation of machine applications are essential in terms of keeping
installation simple and avoiding errors, ensuring safe operation, and allowing access to the
machine for servicing and corrective maintenance.
This chapter outlines what you need to consider when configuring your plant in relation to this
machine and the preparations you need to make before the machine is delivered.
4.1
Safety-related aspects to consider when configuring the plant
A number of residual risks are associated with the machine. These are described in the chapter
titled "Safety information" (Page 11) and in related sections.
Take appropriate safety precautions (covers, barriers, markings, etc.) to ensure the machine is
operated safely within your plant.
4.2
Observing the operating mode
Observe the machine's operating mode. Use a suitable control system to prevent overspeeds,
thus protecting the machine from damage.
4.3
Delivery
Checking the delivery for completeness
The drive systems are put together on an individual basis. When you take receipt of the
delivery, please check immediately whether the items delivered are in accordance with the
accompanying documents. Siemens will not accept any claims relating to items missing from
the delivery and which are submitted at a later date.
● Report any apparent transport damage to the delivery agent immediately.
● Report any apparent defects/missing components to the appropriate SIEMENS office
immediately.
Archive the safety and commissioning notes provided in the scope of delivery as well as the
optionally available operating instructions so that these documents are always easily
accessible.
The rating plate optionally enclosed as a loose item with the delivery is provided to enable the
motor data to be attached on or near the machine or installation.
1PC134, 1PC136 crane motors SH 132 ... 315
Operating Instructions, 02/2019, A5E43212221A