hit counter script

Application Planning; Transport; Unpacking And Checking The Delivery Unit - Siemens SIMATIC Series Getting Started

Industrial pc
Hide thumbs Also See for SIMATIC Series:
Table of Contents

Advertisement

Application planning

3.1

Transport

Despite the device's rugged design, its internal components are sensitive to severe
vibrations or shock. You must therefore protect the PC from severe mechanical stress when
transporting it.
You should always use the original packaging for shipping and transporting the device.
CAUTION
Risk of damage to the device!
When transporting the PC in cold weather, it may be submitted to extreme variations in
temperature. In this situation, ensure that no moisture (condensation) develops on or inside
the device.
If condensation has developed on the device, wait at least 12 hours before you switch it on.
3.2

Unpacking and checking the delivery unit

Unpacking the device
Note the following points when you unpack the unit
● It is advisable not to dispose of the original packing material. Keep it in case you have to
● Please keep the documentation in a safe place. It is required for initial commissioning and
● Check the delivery unit for any visible transport damage.
● Verify that the shipment contains the complete unit and your separately ordered
● Please inform Siemens AG by means of the enclosed SIMATIC IPC/PG quality control
SIMATIC IPC847C
Getting Started, 12/2010, A5E02669190-02
transport the unit again.
is part of the device.
accessories. Please inform your local dealer of any disagreements or transport damage.
report form.
3
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic ipc847c

Table of Contents