Setup
1
Installing the Handlebar
Parts needed for this procedure:
1
Upper handlebar
4
Bolt (5/16 x 1 inch)
4
Nut (5/16 inch)
Procedure
Place the upper handlebar so that it can be installed using
the nuts and bolts. (Figure 3).
Note: Ensure that the decal is in the correct position so it
can be read by the operator while in the operators position;
refer to Figure 11.
3
1
1. Bolt
2. Nut
4
2
G020818
Figure 3
3. Upper handlebar
4. Decal
2
Installing the Tow Rope
Parts needed for this procedure:
1
Left spreader
1
Right spreader
2
Pull grip
2
Rope
Procedure
1. Thread the end of the rope through a pull grip (Figure
4).
1
2
3
4
1. Pull grip
2. Overhand knot
2. Tie an overhand knot in the free end of the rope
(Figure 4).
3. Thread the free end of the rope through the hole in the
right spreader (Figure 4).
4. Tie an overhand knot in the short end of the rope.
5. Repeat steps 1 and 2 with the other segment of rope
and pull grip.
6. Thread the long end of the rope through the hole in
the left spreader.
7. Tie an overhand knot in the free end of the rope.
6
1
G020823
Figure 4
3. Rope
4. Spreader (right)