175-CH Chamber Assemblies
Figure 1: Assembling the diaphragm
175-CH Diaphragm Assembly
Slide – 012 O-ring (A) onto piston (B). Place the diaphragm with the
hole (C) onto the piston (B). Slide the washer (D) onto the piston
(B). Attach the thread extension (E) onto the piston (B). Torque to
100-110 in.-lbs.
21 | GE Oil & Gas
Figure 2: Fastening the thread extension
175-CH Cartridge Assembly
Insert – 145 O-ring (F) into the cartridge spacer (G). Place the
cartridge spacer (G) between the diaphragm assembly and spring
chamber (H) as shown in Figure 2. Slide the inner tube (I) through
the spring chamber (H). Attach the thread extension (E) to the
inner tube (I) using 1/2-20 SS jam nut (J). Torque the jam nut (J) to
100-110 in.-lbs.
© 2016 General Electric Company. All rights reserved.