Standard Operation Process
Document No. : Hawking FA disassembly SOP
Process Name :
Catch Hinge UP
Fixture list(fixture specifications)
Ver. :
Step:
1.Open machine with the angle then close ,
make hinge desperate with top.
2. Get TOP from upside
Qty
Fixture list(fixture specifications)
Tabulator: Ya Zhu
Station:
2018/03/12
1.00
Date
:
Department:
11(1/1)
Qty
IE