hit counter script

Installing The Gas Outlet Casing; Fig. 36: Fitting The Gas Outlet Casing; Table 39: Tightening Torque (51101) - ABB HT596388 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / TPS44-H.. - TPS52-H..
9 Dismantling and fitting / 9.16 Installing the gas outlet casing
9.16

Installing the gas outlet casing

Fig. 36: Fitting the gas outlet casing
Part number
51008
Table 39: Tightening torque (51101)
1. Coat the threads of the hexagon-head screws or studs (51008) with high-temperature
grease.
2. Align the casing position of the gas outlet casing (61001) to the marking.
3. Fit two hexagon-head screws (51008) in the upper area of the gas outlet casing.
4. Position the gasket (52400) on the threads of the hexagon-head screws (51008).
5. Install the gas outlet casing (61001) on the turbine casing with the two screws.
6. Fit the remaining screws (51008), then tighten all the screws.
© Copyright 2017 ABB. All rights reserved.
TPS44
M8
25 Nm
HZTL4037_EN
TPS48
M8
25 Nm
Revision E
TPS52
M10
50 Nm
July 2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps52-h33

Table of Contents