hit counter script

Post Installation Checklist; Applying Power; Verifying Proper Operation; Figure 4-5 Reference Leds - Siemens A53687 Installation & Operation Manual

Airlink mercury software defined radio (sdr)
Table of Contents

Advertisement

GPS SYNCHRONIZATION
_________________________________________________________________________________________________________
4.6

Post Installation Checklist

The radios should come from the factory with configurations predetermined upon ordering. This
section applies to powering the radios on with proper configuration files. If changes need to be
made to radio configurations, refer to Section 6 for configuration information.

4.6.1 Applying Power

Before applying power to the station, make sure all cables are securely connected. Turn on the
DC circuit breaker or fuse that is supplying power to the radio.

4.6.2 Verifying Proper Operation

The Mercury front panel includes three LEDs as shown in Figure 4-5.

Figure 4-5 Reference LEDs

4-5
COM-00-21-03
OCTOBER 2021
Version No.: A

Advertisement

Table of Contents
loading

Table of Contents