hit counter script

Step 9. Connecting The Sas Cables To The Expansion Enclosures; Secure The Cable Management Arm And The File Module In The Rack For Shipping If Needed; Install The Front Screws - IBM 2073-700 Quick Installation Manual

Table of Contents

Advertisement

Figure 28. Secure the cable management arm and the file module in the rack for shipping if
needed.
8. Slide the file module into the rack until it snaps into place. To slide the file
Figure 29. Install the front screws.

Step 9. Connecting the SAS cables to the expansion enclosures

This task applies if you are installing one or more expansion enclosures.
Note: The enclosure terminology that is used in this topic is described fully in
"Step 2. Identifying the hardware components" on page 4.
Be aware of these guidelines when you begin to attach the cables to the SAS ports:
v No more than five expansion enclosures can be chained to port 1 (below the
24
Storwize V7000 Unified: Quick Installation Guide
module out of the rack, press on the release latches 1 .
Note: When you move the rack cabinet, or if you install the rack cabinet in a
vibration-prone area, insert the M6 screws 2 in the front of the file module.
S t o
S t o
r w
r w
i z e
i z e
V 7
V 7
0 0
0 0
0 U
0 U
n i f
n i f
i e d
i e d
1
2
control enclosure). The connecting sequence from port 1 of the node canister is
called chain 1.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storwize v7000 unified2076

Table of Contents