hit counter script
Download Print this page

Advertisement

ACER XV272K V3
ACER_XV272K V3 _SM20230815V1
Acer Monitor XV272K V3
LIFECYCLE EXTENSION GUIDE
1

Advertisement

loading

Summary of Contents for Acer XV272K V3

  • Page 1 ACER XV272K V3 ACER_XV272K V3 _SM20230815V1 Acer Monitor XV272K V3 LIFECYCLE EXTENSION GUIDE...
  • Page 2: Table Of Contents

    ACER XV272K V3 Contents Table of Contents Important Safety Notice ......................3 Exploded Diagram ....................... 4 Wiring connectivity diagram ....................6 Mechanical Instruction ......................7 Assembly and Disassembly SOP ..................8 Troubleshooting ........................ 14 FRU List ..........................16 Safety Notice...
  • Page 3: Important Safety Notice

    ACER XV272K V3 Important Safety Notice Product Announcement: This product is certificated to meet RoHS Directive and Lead-Free produced definition. Using approved critical components only is recommended when the situation to replace defective parts. Vender assumes no liability express or implied, arising out of any unauthorized modification of design or replacing non-RoHS parts.
  • Page 4: Exploded Diagram

    ACER XV272K V3 1. Exploded Diagram 1.1 Product Exploded Diagram 1.2 BOM LIST...
  • Page 5: Wiring Connectivity Diagram

    ACER XV272K V3 2. Wiring connectivity diagram...
  • Page 6: Mechanical Instruction

    ACER XV272K V3 3. Mechanical Instruction Tools Required List the type and size of the tools that would typically can be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description:...
  • Page 7: Assembly And Disassembly Sop

    ACER XV272K V3 4. Assembly and Disassembly SOP 4.1 Disassembly Procedures Preparation before disassemble Clean the room for disassemble Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor ;prepare the area for material flow;...
  • Page 8 ACER XV272K V3 A. Using the screw driver to remove the screw on the key pad board Disassemble the key board, the cable and and take the keypad board off shielding B. Tear off the tape of fixing the wire and shielding C.
  • Page 9 ACER XV272K V3 4.2 Assembly Procedures Preparation before assemble: Clean the room for work Identify the area for material Prepare the implement, equipment, materials as bellow: working table Screw-driver Knife glove cleaning cloth ESD protection A. Input the LCD on the pallet B.
  • Page 10 ACER XV272K V3 A. Assemble the speaker on the shielding Assemble the Speaker B. Assemble the speaker wire on main board C. Fix the speaker wire on the shielding Connect the wire of Assemble left speaker Assemble right speaker speaker on mainboard Fix the speaker wire with tape A.
  • Page 11 ACER XV272K V3 A. Load the keypad board on the back cover with screw driver Assemble back cover B. Assemble the keypad board and LED wire to the keypad board C. Assemble the back cover and press it with hand through bottom, left,...
  • Page 12: Troubleshooting

    ACER XV272K V3 5. Troubleshooting...
  • Page 13: Fru List

    ACER XV272K V3 6.FRU List This chapter gives you the FRU (Field Replaceable Unit) listing in global configurations of ACER KG272UX . Refer to this chapter whenever ordering for parts to repair or for RMA (Return Merchandise Authorization). Please note that WHEN ORDERING FRU PARTS, you should c heck the most up-to-date information available on your regional web or channel.