hp ProLiant DL320 generation 2 server high-density deployment technical white paper
WARNING: To reduce the risk of electrical shock or damage to the equipment:
IMPORTANT: In Compaq branded 7000-series racks, route the power cables from the servers
to the PDUs through the gap in the rear of the rack rail.
remote console management
The remote console management system uses a CAT5 cable connected to the RJ-45 connector in
the Remote Insight Lights-Out PCI board and the power cord. Route these cables through the
cable management system according to the instructions either in the HP ProLiant DL320
Generation 2 Server Setup and Installation Guide or the HP Sliding Rails and Cable
Management Guide for the ProLiant DL320 Generation 2 Server. Connect the power cord to the
PDU and the CAT5 cable to the network data line outlet.

completing the installation

To complete the installation:
1. Install side panels on the outsides of the end racks.
2. Install the front and rear doors.
3. Connect the PDUs to the power source.
4. Power up the servers.
Unplug the power cord from the system.
Do not disable the power cord grounding plug. The grounding plug is an important
safety feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible
at all times.
Do not route the power cord where it can be walked on or pinched by items placed
against it. Pay particular attention to the plug, electrical outlet, and the point where the
cord extends from the server.