Indoor residential and commercial models
temperature modulated with electronic ignition
suitable for heating potable water - not approved for space heating purposes
(intended for variable flow applications) (65 pages)
Gas condensing wall hung & floor standing boilers (76 pages)
Summary of Contents for Bosch Greenstar combi 100 p
Page 1
These instructions are available in English and French. Please keep these instructions for future reference. 0010004900-002 Residential Gas Condensing Boiler Greenstar combi 100 p / 151 p ZWB28-3A... | ZWB42-3A... Installation and Service Instructions for Contractors...
17 Commissioning log for the appliance....60 people or property. Additional symbols Symbol Explanation ▶ Sequence of steps Cross-reference to another part of the document • Listing/list entry – Listing/list entry (2nd level) Table 1 Greenstar combi 100 p / 151 p 6720872361 (2017/04)
DANGER: Risk of personal injury or death after a flood! ▶ Do not attempt to operate an appliance if any part of it has been under water. ▶ An appliance that was subject to flooding must be replaced. 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Gas conversion kit Adapter for connection of a LWCO 6 720 641 933-84.2O Fig. 2 Data plate location The rating plate contains the appliance output, model number, approval data and serial number. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
CZM 100 is an expansion module for several heating zones with valves or pumps. Optional combination with CRC 100 and CRC 200. • Bosch remote control FW 200 USA (part number 8 718 226 215 0): weather-compensated heating controller. Optional combination with ICM 100.
Dimensions and minimum clearances (front view, rear view, side view) Outer jacket complete Front cover Hydraulics connection plate Zero clearance from combustibles permitted, but 4" (102 mm) recommended for serviceability (**) Distance to door, if mounted inside a closet Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Weight (without packaging) lbs. (kg) 110.2 (50) 110.2 (50) Dimensions, W x H x D inch 17-21/64" × 33-15/32" × 13-57/64" (mm) (440 × 850 × 353) Table 3 Technical data ZWB28-3A... Greenstar combi 100 p / 151 p 6720872361 (2017/04)
“GAS VENT DIRECTLY BELOW. DO NOT BLOCK.” • CHECK. The state or local gas inspector of the side wall horizontally vented gas-fueled equipment shall not approve the installation unless, upon inspections, the inspector observes carbon monoxide 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
To heating zone 3 Bosch room temperature controller heating zone 3 (CRC100) Motorized valve heating zone 2 For all accessories not included in the package please refer to the Bosch To heating zone 2 Product Catalog. Bosch room temperature controller heating zone 2(CRC100)
Page 16
PCB in wall-mounted gas condensing boiler 120 V AC mains power (white plug) ( Chapter 7.3, page 34) 120 V AC, 60 Hz For all accessories not included in the package please refer to the Bosch System pump Product Catalog.
Piping Pump heating zone 3 To heating zone 3 Bosch room temperature controller heating zone 3 (CRC100) For all accessories not included in the package please refer to the Bosch Pump heating zone 2 Product Catalog. To heating zone 2...
Page 18
[10] DHW temperature sensor (inside gas condensing boiler) [11] Optionally connect external system supply temperature sensor for system supply pipe here (with white plug) For all accessories not included in the package please refer to the Bosch Product Catalog. 6720872361 (2017/04)
▶ Empty out sediment traps. Anti-freeze ▶ Systems containing antifreeze not approved by Bosch, must be completely flushed to ensure no old fluid remains. NOTICE: ▶ Fill the system with fresh water and the proper amount of inhibitor.
Cold water, R 3/4" NPT For walls with insufficient load capacity, the appliance and the Heating return, R 1" NPT hydraulics connection plate must be mounted on a sheet of plywood or similar reinforcement. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
▶ Place the gaskets on the pipe connections. ▶ Hang the appliance. ▶ Check the positioning of the gaskets on the pipe connections. ▶ Tighten the union nuts on the pipe connections. 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Ø > Ø • Hydrolevel Safgard 1100 The device is available at most Bosch wholesalers. It requires an Ø external 24VAC AC 20VA transformer provided on site. When a different LWCO is used, it must be installed outside the wall- mounted gas condensing boiler.
As an alternative to twin pipe venting, a purposely designed and built telescopic concentric vent kit can be obtained as an accessory from Bosch Thermotechnology for a horizontal direct vent wall termination. This vent system can be used for vent lengths of 2 feet to 3 feet (610 mm to 915 mm).
Page 25
The flue pipe must be supported properly and angled downward at least ¼ inch (6.35 mm) per foot from the wall-mounted gas condensing boiler. This allows the condensate to drain away. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Page 27
Authority Having Jurisdiction. 2) A vent shall not terminate directly above a sidewalk or paved driveway that is located between 2 single family dwellings and serves both dwellings. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Gas line ▶ Close the gas shutoff valve to protect the gas valve from damage. ▶ Check all connections for leakage (test pressure: Max. 60" W.C. (150 mbar)). ▶ Release pressure. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Replacement fuses can be found on the back of the cover ( Fig. 36, page 32.) Controls and modules For installation and electrical connection of controls and modules, see the installation instructions of the accessory. 6 720 641 933-86.1O Fig. 36 Remove the cover 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
▶ Feed cable through strain relief and connect accordingly. ▶ Secure the cable on the strain relief. ϑ Bosch room controls Connect only Bosch room controls to the internal BUS of this boiler. ≤ 4" For installation and electrical connection, see the installation (102 mm) 6 720 641 933-97.1o...
6 720 641 933-70.2O Fig. 42 Electrical wiring third party room thermostat or zone control To communicate a heat demand the third party room thermostat or zone control must connect pins 2 and 4. 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
▶ Connect the two leads labeled 24 V HOT (red) and 24 V COMMON (white) to the external 24 VAC transformer. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
▶ If the appliance is taken out of service for a longer period: Observe approx. 122 °F (50 °C) frost protection ( Section 8.6). approx. 140 °F (60 °C) Table 21 Hot water temperature Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Fig. 51 Frost protection of the heating system -or- If you want to leave the appliance switched OFF: ▶ Mix Bosch-approved anti-freeze into the heating water ( Tab. 19, The DHW on demand signal allows maximum gas and water savings.
The light of the emissions test button will go out. In order to save as much energy as possible and keep any water circulation noises to a minimum, select the lowest possible pump speed. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Table 22 Service functions, 1nd level ▶ Select the DHW output in MBH (kW) and determine the associated setting in percent (%). ▶ Enter the setting ( 10.1). ▶ Save the setting ( 10.1). 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Page 41
• 01: Purging function is switched on and after completion Default setting is 00 (switched off). automatically reset to 00 • 02: Purging function is permanently on and is not reset to 00 Default setting is 01. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Page 42
• 00: Condensate trap filling sequence is off. Default setting is 01 (1 minute). • 01: Trap filling program at the lowest output. • 02: Trap filling sequence at set minimum output. Default setting is 01. 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Page 43
With this service function you can activate and deactivate the indicator lamp for burner operation (continuously illuminated) and faults (flashing). The following settings are available: • 00: Off • 01: On Default setting is 00. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Service function 8.C: GFA Gas burner control unit status Service function 9.b: Current fan speed Internal parameter. If you are on the line with Bosch Technical Support This service function allows you to display the current fan speed in you may be asked for this number.
• 02: DHW heat demand present ▶ Follow the instructions from the conversion kit. With the gas conversion kit there is no setting of the gasair ratio (CO ) necessary. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
▶ Briefly press the emissions test button The supply temperature alternates on the display with maximum nominal output. ▶ Measure the CO or O level and the CO content of the flue gas ( Section 12). 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
▶ Switch the appliance OFF, turn off the gas cock, remove the pressure gauge and tighten the screw in the test port for gas inlet pressure. ▶ Reinstall the cover. 6 720 641 933-80.1O Fig. 60 Close flue gas test ports Greenstar combi 100 p / 151 p 6720872361 (2017/04)
▶ Remove the flue gas probe and seal the flue gas test port properly ( Fig. 60, page 47). 1) 9.4 Vol.% with NG and 11.0 Vol.% with LPG (propane) 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
▶ If necessary, clean with plastic brush under running water. years after the initial commissioning. ▶ Only use a Bosch cleaning blade and Bosch cleaning brush. ▶ Only clean heat exchanger in case if soiling is clearly visible. Heatronic boiler control In case of a component defect, a fault is shown on the display.
If mechanical cleaning is required: To clean of the heat exchanger, use Bosch burner gaskets, cleaning brush kit and cleaning blade, all of which are available as spare parts. ▶ Remove the condensate trap (steps 1 and 2) and place a suitable container underneath.
Page 52
▶ Close the inspection opening again using a new gasket and tighten the screws with approx. 3.69 ft.-lbf. (5 Nm). 6 720 612 563-14.1O Fig. 75 Cleaning the heat exchanger with the cleaning brush ▶ Remove burner ( Chapter 14.1.5 “Burner servicing”). 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
14.1.12 Checking the electrical wiring ▶ Check electrical wiring for mechanical damage and replace defective cables. 6 720 641 933-94.1o Fig. 79 Opening the mixer unit Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Check the heating system filling pressure. psi (bar) Inspect electrical wiring for damage. Check settings of the heating control. Check set service functions according to commissioning report. Table 29 Maintenance and inspection checklist 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
( operating instructions) or building drying function ( service function 7.E) are activated. Key pad lock enabled. To unlock the key pad, press until the supply temperature is shown on the display. Table 31 Special displays Greenstar combi 100 p / 151 p 6720872361 (2017/04)
▶ Check fan leads and fan, replace if defective. Outdoor temperature sensor not recognized. ▶ Check outdoor temperature sensor and leads for interruptions, replace if defective. ▶ Verify the outdoor temperature sensor is connected to terminals A and F. 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Page 57
Flame detected even when burner is off. ▶ Check electrodes; replace if defective. ▶ Check flue gas system; clean or repair if defective. ▶ Check PCB for moisture; dry if needed. Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Heatronic is flashing (i.e. all buttons, all display segments, ▶ Replace fuse Si 3 (24 V) (6.3 A fuse according to IEC default). burner indicator etc. are flashing) Table 33 Faults not shown on the display 6720872361 (2017/04) Greenstar combi 100 p / 151 p...
Page 61
Attention has been drawn to the requirement for regular maintenance of the above-mentioned heating system. ___________________________________________________________ __________________________________________________________ Name of service engineer Date, user's signature Affix the test report here. ____________________________________________________________ Date, system installer's signature Table 38 Commissioning log Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Page 63
Heat output (service function 1.A) ......40 Hot water temperature (service function A.b) ....45 Greenstar combi 100 p / 151 p 6720872361 (2017/04)
Page 64
50 Wentworth Avenue Londonderry, NH 03053 Tel. 603-552-1100 Fax 603-965-7581 www.bosch-climate.us U.S.A. Products manufactured by Bosch Thermotechnik GmbH Junkersstrasse 20-24 D-73249 Wernau www.bosch-thermotechnology.com Bosch Thermotechnology Corp. reserves the right to make changes without notice due to continuing engineering and technological advances.