Page 1
RRU3249 Installation Guide Issue DraftA Date 2015-05-30 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
Before the installation, pay attention to the following items: The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. The number of onsite personnel depends on the engineering schedule and installation environment.
Figure 3-8 Four RRUs installed in centralized mode NOTE For details about how to install RRUs on an IFS06, see DBS3900 (ICR) Installation Guide. 3.5 Installation Clearance Requirements of an RRU This section describes the requirements for the installation clearance of multiple RRUs and the requirements for the installation spacing between RRUs.
The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Step 2 Check the exterior of the packing case. Issue DraftA (2015-05-30) Huawei Proprietary and Confidential...
Page 26
Sign the Packing List with the customer. those on the packing list Either shipment shortage, wrong shipment Report to the local Huawei office. or damaged articles. CAUTION l To protect the equipment and prevent damage to the equipment, you are advised to keep the...
Page 65
Side. A connector or OT terminals are added to the RRU power cable on the power device side. For details, see DBS3900 Installation Guide. Context If a power device provided by the customer is used, the recommended specification of the circuit breaker on this power device is 15 A to 30 A.