Fire Safety Model CP-2ER Control Panel Operation, Installation, and Maintenance Manual Siemens Building Technologies, Inc. Siemens Building Technologies, Ltd. 8 Fernwood Road 2 Kenview Boulevard Florham Park, New Jersey 07932 Brampton, Ontario L6T 5E4 CN P/N 315-093523-7...
Table of Contents INTRODUCTION ....................1 OPERATION ......................2 CONNECTION DIAGRAM ................4-5 INSTALLATION AND WIRING ................7 POWER LIMITED WIRING .................. 8 MAINTENANCE AND TESTING ................9 TROUBLESHOOTING THE SYSTEM ..............9...
(VISIBLE WITH DOOR CLOSED) 2A AC INPUT CIRCUITBREAKER SERVICE SELECTION JUMPER PLUG P72 (LOCAL) OR P12 (RELEASE) PR-24 POWER PLUG GROUND DISCONNECT PLUG Figure 1 Model CP-2ER INTRODUCTION SIEMENS RESET/LAMP TEST ALARM SILENCE SUPERVISORY SILENCE TROUBLE SILENCE RELEASE DISCONNECT SERVICE SELEC-...
OPERATION For NFPA 72 Local Service: External Output Loading SERVICE SELECTION NOTE: CON- NECTION DIAGRAM Initiating Circuit and Local Protective Signaling Panel Operation SERVICE SELECTION Jumper SERVICE SELECTION VISUAL INDICATORS COLOR Visual Indicators Externally Visible POWER Steady on indicates main power is normal. Green ...
Page 6
ALARM 120mA Class A or Class B. CLASS A CONNECTION 1.78K 1/2W EOL P/N 140-016124 TYPICAL CONNECTION TO FIRE ALARM SYSTEM (When CP-2ER panels are arranged for NFPA Releasing Service) CP-2ER CP-2ER ALARM TROUBLE ALARM TROUBLE BATTERIES 24 VDC Charging Current Normal: 300mA, 24 VDC...
Page 7
PE-3/3T DB-3S P/N 315-090875-7 PE-11/11T DB-11 P/N 315-094198-9 DB-3S with DB-ADPT P/N 315-094198-9 AD-11P P/N 315-095659-7 CP-2ER is the compatibility identifier DESIGNATION RATING CIRCUIT Battery General Alarm Audibles e t t Discharge Audibles Discharge Circuit t I * e t t o i t Siemens Building Technologies, Inc.
Page 8
OPTIONS 1. Discharge Delay Selection Switch S101 Position II Closed; I Open MANUAL DISCHARGE Dial setting Switch S101 Rotate to change setting NOTE: Dial Discharge Delay Setting Period (seconds) 4. Predischarge/Discharge Delay Operation Selection (TB3, Terminals 10 through 14) Dipswitch PS3 Position I Closed;...
CONNECTION DIAGRAM Installation of Conduit and Outlet Boxes Installation of Detector Bases Wiring (Refer to CONNECTION DIAGRAM) System Operation Test CAUTION: Be sure to prevent release of the agent. Installing Bases CONNECTION DIAGRAM. POWER LIMITED WIRING Wiring Test NOTE: must be observed...
MODULE TERMINATION KNOCKOUT N = NON-POWER LIMITED TERMINALS CP-2ER TB-1 (All positions) 1 or 2 Figure 3 PLM-35 CP-2ER Power Limited Wiring PLM-35 Installation Instructions, MAINTENANCE AND TESTING TROUBLESHOOTING THE SYSTEM OPERATION CONNECTION DIAGRAM CAUTION: Make sure that release circuits and shunt...
Page 12
CONNECTION DIAGRAM NOTE: RELEASE DISCONNECT With Class B wiring: Recommended Spare Parts Fuse Rating Part No. With Class A wiring: 105-210734 105-210758 105-215996 P/N 315-093523-7...