hit counter script

Planning Procedure - Siemens FS20 Planning Manual

Fire detection system
Table of Contents

Advertisement

Item no. Designation/function
1
↑ GAP station
2
↑ SAFEDLINK stations
3
↑ Router stations
4
↑ Standby router
stations
5
↑ Ethernet station
(standby station or
terminal)
6
SAFEDLINK sub-net 1
7
FCnet/LAN
8
SAFEDLINK sub-net 2
9
Ethernet switch
(modular) FN2012
10
Ethernet connection
11
Uploading,
downloading
SintesoView
↑ Management
station

8.4 Planning procedure

Building Technologies
Fire Safety
Address
Ethernet
192.168.201.1
192.168.100.x
Any
192.168.201.5
Table 30: Internal access to extended network via GAP
The following details must be known:
Operating concept
Planned system extensions
When planning the networking of the ↑ stations, proceed as follows:
1. Determine the locations of the stations.
2. Determine the location of the station with remote transmission for redundant
networking.
3. Determine the type of networking (SAFEDLINK, extended networking via
FCnet/LAN, Ethernet or mixed) and the line type.
4. Define the fire control panels that must be equipped with two network modules
(SAFEDLINK).
5. Determine the ↑ router stations for ↑ extended networking, equipped with
Ethernet switch (modular) FN2012
6. Define the station for remote access (optional).
Planning the networking of the stations
Address
Notes
↑ SAFEDLINK
Configured as GAP with DHCP
server function
192.168.1.x
IP address range for SAFEDLINK
sub-net 1 (pre-setting, can be
changed)
IP address range for Ethernet sub-
net (pre-setting, can be changed)
192.168.2.x
IP address range for SAFEDLINK
sub-net 2 (pre-setting, can be
changed)
Address must not be the same as
the address in the FCnet/LAN
Connected to FN2012 of the standby
station (example)
Ethernet client is configured to
automatically reference an IP
address (see item 1)
8
Planning procedure
107 | 242
008843_v_en_--
2015-12-15

Advertisement

Table of Contents
loading

Table of Contents

Save PDF