hit counter script

Cabling The Server And Setting Up A Console; Determining Which Console To Use - IBM Power System S822 Installing Instructions

Table of Contents

Advertisement

Figure 14. Installing the mounting bracket into the slide rail
7. Place the cable-management arm (D) on the support arm (A). Slide the first cable-management arm
tab into the slot on the mounting bracket (C). Push the tab until the spring-loaded latch snaps into
place. Slide the other cable-management arm tab into the extension bracket (E) on the outside of the
right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see
Figure 15.
Figure 15. Connecting the cable-management arm

Cabling the server and setting up a console

Your console, monitor, or interface choices are guided by whether you create logical partitions, which
operating system you install in your primary partition, and whether you install a Virtual I/O Server
(VIOS) in one of your logical partitions.

Determining which console to use:

Your console, monitor, or interface choices are guided by whether you create logical partitions, which
operating system you install in your primary partition, and whether you install a Virtual I/O Server
(VIOS) in one of your logical partitions.
Choose one of the consoles, interfaces, or terminals in the following table.
10
Power Systems: Installing the IBM Power System S822 (8284-22A)

Advertisement

Table of Contents
loading

This manual is also suitable for:

8284-22a

Table of Contents