To 36 Month Inspection; Year Maximum Inspection - ABB K-Line Plus Installation And Maintenance Instructions Manual

Low voltage switchgear
Table of Contents

Advertisement

K - L i n e
P l u s
18
36 M
TO
ONTH
Perform the following at 18 to 36 month intervals or sooner if required
by local conditions or regulations.
1.
Clean the circuit breaker stationary primary contacts.
IB6.2.11.1-1A, " Installation/Maintenance Instructions for Low
Voltage Power Circuit Breakers."
excessive heat, arcing, or corrosion. If found, follow the procedure
described under " Suspect Joint Maintenance" on page 55.
2.
Inspect secondary wiring bundles for signs of discoloration
because of heat or chafing.
insulation. Replace wire whenever doubtful.
3.
Inspect primary insulation system for accumulated contamination.
Clean insulation with a dry cloth, dry-air, vacuum, or if necessary
with an OSHA approved solvent.
4.
Check the calibration of protective relays approximately every two
years.
10 Y
M
EAR
AXIMUM
1.
Disassemble, inspect, clean, lubricate, adjust, and calibrate circuit
breaker mechanisms.
2.
Torque all primary conductor connection bolts to recommended
values. See Table 1.
3.
Tighten all secondary control wire connections. Check for loose
lug crimps and broken wire strands.
I
NSPECTION
Check for cracked or embrittled
I
NSPECTION
50
Inspect for evidence of
See