SUN2000-(33KTL, 36KTL, 40KTL)-US
User Manual
4.5.3 Tilted Support-mounted Installation
Procedure
Step 1 Determine the positions for drilling holes using the mounting bracket. Level the hole positions
using a level, and mark the hole positions using a marker.
Figure 4-18 Determining hole positions
Step 2 Drill holes using a hammer drill.
Figure 4-19 Drilling holes
Issue 01 (2017-04-01)
You are advised to apply anti-rust paint on the hole positions for protection.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
33