hit counter script

Advertisement

SmartModule1000A01
Quick Guide
Issue: 04
Part Number: 31500BWV
Date: 2020-05-11
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SmartModule1000A01

  • Page 1 SmartModule1000A01 Quick Guide Issue: 04 Part Number: 31500BWV Date: 2020-05-11 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Before installing the device, closely read the user manual to get familiar with product information and safety precautions. Huawei shall not be liable for any consequence caused by violation of the storage, installation, and operation regulations specified in this document and the user manual.
  • Page 3: Installation Requirements

    Installation Requirements Dimensions Space Device Installation Wall-Mounted Installation • Install the SmartLogger and SmartModule on a flat and secure interior wall. • When wall-mounting the SmartLogger and SmartModule, ensure that the cable connection area faces downward for ease of cable connection and maintenance. •...
  • Page 4 2. Install the SmartLogger and SmartModule. Guide Rail-Mounted Installation (Stand-alone) • Before installation, prepare a standard 35 mm guide rail and secure it. • The recommended effective length of the guide rail is 360 mm or greater. • Ensure that the SIM card slot on the SmartLogger is not blocked.
  • Page 5 Guide Rail-Mounted Installation (Combined) • Before installation, prepare a standard 35 mm guide rail and secure it. • The recommended effective length of the guide rail is 360 mm or greater. • Ensure that the SIM card slot on the SmartLogger is not blocked. 1.
  • Page 6: Electrical Connections

    Electrical Connections • Connect cables in accordance with the installation laws and regulations of the country or region where the project is located. • Before connecting cables to ports, leave enough slack to reduce the tension on the cables and prevent poor cable connections.
  • Page 7: Connecting The Ethernet Cable

    Connecting the Ethernet Cable • The SmartModule can be connected to the SmartLogger and a PC over the GE port. • Connect the LAN port on the SmartLogger to one GE port on the SmartModule using an Ethernet cable. • If the delivered network cable is too short, you are advised to prepare a network cable of Cat 5e or higher specifications and shielded RJ45 connectors.
  • Page 8 Connecting the RS485 Communications Cable • It is recommended that the RS485 communication distance be less than or equal to 1000 m. • The SmartModule can connect to RS485 communications devices, such as a solar inverter, an environmental monitoring instrument (EMI), and a power meter over the COM port. •...
  • Page 9 Connecting the DI Signal Cable • The SmartModule can receive DI signals such as remote power grid scheduling commands and alarms over DI ports. It can only receive passive dry contact signals. • It is recommended that the signal transmission distance be less than or equal to 10 m. Port Description Can receive passive...
  • Page 10 Connecting the AI Signal Cable • The SmartModule can receive AI signals from the EMIs over the AI ports. • It is recommended that the transmission distance be less than or equal to 10 m. • AI ports 1, 2, 3, and 4 are for AI+ signals, and the GND port is for AI– signals. Port Description Supports 0–10 V...
  • Page 11 Two-Wire System When the PT ports need to be connected to a two-wire PT100/PT1000, use a short-circuit cable to short-circuit GND and – of the ports. PT100/PT1000 temperature sensor 4.10 Connecting the 24 V Input Power Cable The 24 V input power cable needs to be connected in the following scenarios: •...
  • Page 12: Check Before Power-On

    Check Before Power-On Criterion The SmartModule is installed correctly and securely. All cables are securely connected. Routing of the power cable and signal cable meets the requirements for routing strong-current and weak-current cables and complies with the cable routing plan. Cables are bound neatly, and cable ties are secured evenly and properly in the same direction.
  • Page 13: Rst Button

    RST Button Operation Function If the Communication using expired certificate function is disabled for the SmartLogger and the digital certificate of the SmartModule becomes invalid, after enabling the function, press the RST button for 3s to 10s to enable the Hold down the SmartModule to enter the mode of ignoring digital certificate expiration and button for 3s to 10s.
  • Page 14 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China solar.huawei.com...

This manual is also suitable for:

Smartlogger 3000b

Table of Contents