MR33 Series (75K-600K) Modular UPS
User Manual
3.3.2 Unpacking
The package of the UPS is similar. Following we take MR33400 as an example to illustrate.
Step 1
Check if the package appearance is in good condition and if there has any transportation damage. If
any damage, please inform the carrier immediately.
Step 2
Transport the UPS to assigned site.
To avoid toppling over during transporting, ensure that the end of the forklift arm exceed the wooden
bracket.
Step 3
Unpack the external package. Remove the foam pad and plastic bag, and take out the accessories and
built-in documents.
Step 4
Check the UPS.
Inspect the appearance of the UPS and check if there has any damage caused by transportation. If
any damage, please inform the carrier immediately.
Compare with the packing list and check if the accessories mode is complete and proper. If the
accessories lack or model wrong, please take note and contact the Kehua Company or local
agency of our company.
Step 5
If the UPS is OK, dismantle the fasten screws of front and rear cover plate at the bottom of the
cabinet (as shown in Figure3-5), by Phillips screwdriver, and then remove the front and rear cover
plate.
Figure3-5 Dismantle the bottom cover plate
All rights reserved ©Kehua Hengsheng Co., Ltd.
3 Installation
35