Huawei FusionDC1000B Quick Manual
Hide thumbs Also See for FusionDC1000B:

Advertisement

Quick Links

FusionDC1000B Prefabricated Modular Data
Center
Quick Guide (2020, Nigeria,
Platform Capital Refinery DC)
Issue
01
Date
2021-01-05
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei FusionDC1000B

  • Page 1 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) Issue Date 2021-01-05 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) About This Document About This Document Purpose This document describes the initial configuration parameters of the data center as well as the precautions, processes, parameters, and drawings for installing the data center.
  • Page 4 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) About This Document Symbol Description Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury.
  • Page 5: Table Of Contents

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) Contents Contents About This Document........................ ii 1 Quick Guide Usage........................1 2 Installing an Aisle Door and an Access Control Device Between Combined Pre- fab. Modules..........................3 3 Installation Drawings......................23 4 Removing Transport Protection Materials..............
  • Page 6: Quick Guide Usage

    This chapter describes the notes for using the quick guide. ● Before the installation, check whether the materials are intact according to the packing list. If there is any problem, contact Huawei technical support. ● This document provides only the initial configuration parameters required for data center commissioning and O&M as well as the drawings and parameters...
  • Page 7 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) 1 Quick Guide Usage ● The figures provided in this document illustrate only installation and connection methods. The actual product appearance prevails. ● Unless otherwise specified, the unit for the dimensions in the figures provided in this document is mm by default.
  • Page 8: Installing An Aisle Door And An Access Control Device Between Combined Pre-Fab. Modules

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Installing an Aisle Door and an Access Control Device Between Combined Pre-fab. Modules Preparations Tools: Phillips screwdriver, adjustable wrench, step ladder, hammer drill, φ8 drill...
  • Page 9 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-1 Installing the door header NO TE Put the posts and door header horizontally on the floor to facilitate assembly.
  • Page 10 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-2 Installing door header sealing plate 1 (Optional) Stand up the door frame, and secure the door frame to the steel floor using tapping screws.
  • Page 11 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules NO TE If there is no mounting hole in the cabinet bottom, you can also secure the posts to the floor.
  • Page 12 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-5 Installing the dampers Step 4 Secure the guide rail to the fixed arm using screw assemblies.
  • Page 13 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-6 Securing the upper guide rail Secure the guide rail to the fixed arm using M6x16 panel screws.
  • Page 14 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Step 6 Install glass door rubber strips and plugs. Figure 2-8 Installing the glass door rubber strips and plugs Step 7 Remove the cable trough cover, and secure the cable trough to the glass door using screws and studs.
  • Page 15 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-9 Installing a cable trough Step 8 Install a card reader. Install the base on the glass door using two M4x16 screws and two M4 nuts.
  • Page 16 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-10 Installing a card reader (1) Card reader Secure the bottom plate to the baffle plate using countersunk screws.
  • Page 17 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-11 Installing the cover for the cable trough Step 9 Install left and right aisle door panels.
  • Page 18 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-12 Installing the aisle door Install the removed bumpers from both ends of the guide rail, secure the bumpers, and install plugs at both ends of the guide rail.
  • Page 19 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Adjust the front and rear distances of the fixed arm to ensure that the door posts are in close contact with the cabinet side panels.
  • Page 20 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-15 Installing the cable chain fastener Install the cable chain on the cable chain fastener.
  • Page 21 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-16 Installing the cable chain Step 13 Install a magnetic lock. Install magnetic lock fastener 1 onto the guide rail, as shown by (1) in Figure 2-17.
  • Page 22 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-17 Installing a magnetic lock Step 14 Install an exit button and emergency button at the door frame post.
  • Page 23 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-18 Installing buttons Route the button cables out of the cable hole in the upper part of the post and then into the upper frame mounting kit of the end door.
  • Page 24 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-20 Securing the door header sealing plates Step 16 Secure the door barrier to the top of the door header using four M6x16 screws.
  • Page 25 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-21 Installing the door barrier Step 17 Place the glass sealing panel from the outer side to the installation position and secure it on the inner side.
  • Page 26 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-22 Installing the glass sealing panel for the rear aisle door Step 18 Connect cables to the aisle access control device based on the installation diagram for the corresponding solution.
  • Page 27 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital 2 Installing an Aisle Door and an Access Control Refinery DC) Device Between Combined Pre-fab. Modules Figure 2-23 Cable route for aisle door monitoring components (1) Access actuator (2) Cable hole...
  • Page 28: Installation Drawings

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) 3 Installation Drawings Installation Drawings Issue 01 (2021-01-05) Copyright © Huawei Technologies Co., Ltd.
  • Page 29 Checklist of Devices Installed Onsite Installation Diagram Subcategory Item Diagram Name Sequence Pre-fab. Module Base Installing Pre-fab. Module Bases Mounting Base NO.S002 Installation Position Solution Installing Twistlocks Diagram Removing the Removing the Transport Transport Protection Cover Removing the Side Panels for Combining with the Next Pre-fab.
  • Page 30 Installation Diagram Subcategory Item Diagram Name Sequence Installing Rubber-Plastic Thermal Insulation Panels Installing Rubber Panels Installing Internal Pre-fab. Module Internal Installing Tread Plates Between Sealing Materials for Combining Material NO.S007 Installing and Combined Pre-fab. Modules Combined Pre-fab. Installation Position Combining Pre- Installing Thermal Insulation Modules Diagram...
  • Page 31 Installation Diagram Subcategory Item Diagram Name Sequence Installing UPS5000-E Power UPS Module Installation NO.P006 Modules Diagram Installing and Connecting a Fire Lithium Battery Cabinet Fire Cylinder in a Lithium Battery No.P015 Cylinder Installation Cabinet Diagram Lithium Battery Module NO.P007 Installation Diagram Installing and Connecting Installing Power Batteries in a Lithium Battery...
  • Page 32 Installation Diagram Subcategory Item Diagram Name Sequence Fire Retardant Bag Installing Fire Installing Fire Installing Fire Retardant Bags NO.S022 Installation Position Retardant Bags Retardant Bags Diagram Installing the Installing the Return Installing the Return Air Return Air Suspended Return Air Air Suspended NO.S023 Suspended Ceiling...
  • Page 33 NO.S002 Pre-fab. Module Base Installation Position Diagram Single-capacity base component Enlarged at 5:1 Dual-capacity base component Enlarged at 5:1 1. Each base has eight mounting holes. Only four mounting holes are required. The external four holes are preferred. If the external holes are conflict with the concrete podium or ground reinforcement, use the internal holes.
  • Page 34 NO.S004 Pre-fab. Module Combining Position Diagram 1. Combination distance block Remove the transport side wall (11 EPS panels) at the module combination position 2. Front distance block (1 PCS/module) Screw assembly M10X40 1. Combination distance block 1. Combination distance block (4 PCS/module) 2.
  • Page 35 NO.S005 Pre-fab. Module Securing Position Diagram Enlarged at 10:1 M10X40 Top connecting plat Note: 1. Use the existing mounting holes to install connecting plates on the top of combined modules to connect and secure the modules. 2. After connecting and securing the modules, install external sealing materials by referring to NO.S006 External Sealing Material Layout Diagram.
  • Page 36 NO.S006 External Sealing Material Installation Position Diagram 5.GB9074_17-88_M10X40_S_ZNAL(48 PCS) 4.GB9074_4-88_M4X12_S(8 PCS) Install Attach roll Apply sealant Install cover rubber strip DKBA04853091_100X800 Clamping plate gap sealing roll t=2mm DKBA04853091_100X800 Screw hole roll Note: t=2mm 1. The installation sequence of external sealing materials is as follows: DKBA04853091_20000X500 Waterproof roll t=2mm...
  • Page 37 NO.S007 Pre-fab. Module Internal Combining Material Installation Position Diagram-1 8. Bottom thermal insulation foam 2 1. ESD veneer 6. Bottom cover Pre-installed 2. Bottom thermal 5. Thermal insulation foam 2 insulation foam 1 3. Armaflex thermal 4. Bottom cover leg insulation pipe 7.
  • Page 38 NO.S007 Pre-fab. Module Internal Combining Material Installation Position Diagram-3 A enlarged view 9. Baseboard 2 Edge wrap 4. Rock wool 2 5. End thermal 7. Flat buckle insulation foam 2. Edge wrap 1.Armaflex thermal insulation pipe Attach the end edge wrap to rock 8.
  • Page 39 NO.S007 Pre-fab. Module Internal Combining Material Installation Position Diagram-3 A enlarged view 9. Baseboard 2 Edge wrap 4. Rock wool 2 5. End thermal 7. Flat buckle insulation foam 2. Edge wrap 1.Armaflex thermal insulation pipe Attach the end edge wrap to rock 8.
  • Page 40 NO.S008 Pre-fab. Module Grounding Position Diagram Pre-fab. module ground point (rear wall) A/B enlarged at 10:1 Pre-fab. module ground point Ground grid Two external ground points are set for each pre-fab. module, and they are set on the front wall. You can select a ground point to connect to the ground grid based on the actual position.
  • Page 41 NO.S009 External Accessories Installation Position Diagram (A direction) Enlarged at 4:1 Note: 1. Secure the eaves to the top of the front and rear walls using M16 bolts delivered with the eaves. 2. Install the snow and rain cover on the mounting plate above the fireproof door, and then secure the cover on the mounting plate.
  • Page 42 NO.S010 Air Conditioner Outdoor Unit Installation Position Diagram Install support on Assemble support Install outdoor Install pipes module top unit Note: Install the outdoor unit on the top in the following sequence: Note: (1) Assemble the outdoor unit support, as shown in the figure about outdoor unit support assembly. Secure the support using stainless steel screws 1.
  • Page 43 NO.S010 Air Conditioner Outdoor Unit Installation Position Diagram Install support on Assemble support Install outdoor Install pipes module top unit Note: Install the outdoor unit on the top in the following sequence: Note: (1) Assemble the outdoor unit support, as shown in the figure about outdoor unit support assembly. Secure the support using stainless steel screws 1.
  • Page 44 NO.S010 Air Conditioner Outdoor Unit Installation Position Diagram DKBA80846280.PRT 13KW air conditioner rubber pad DKBA80867930.ASM Pipe fixing plate DKBA81073313.ASM 13KW air conditioner fastener 3 DKBA61613967.ASM 13KW air conditioner support DKBA81073313.ASM 13KW air conditioner fastener 3 DKBA83116352.ASM 13kw air conditioer cross beam DKBA83116353.ASM 13kw air conditioer side beam 1 DKBA80716390.ASM...
  • Page 47 NO.S011 Water Refill and Drain Pipe Installation Position Diagram Winding tape Gas pipe Signal cable Power cable Liquid pipe Thermal insulation foam (A direction) (C direction) (B direction) A part enlarged at 5:1 C part enlarged at 5:1 B part enlarged at 5:1 Liquid refrigerant pipe Liquid refrigerant pipe Liquid refrigerant pipe...
  • Page 48 NO.F004 Fire Extinguishing Device Installation Position Diagram (CE) Air outlet window Emergency Lighting Emergency Lighting-DH-2 Connecting Cables to the Fire Window CB-PR-A1 Control Panel Batteries Onsite Horn Strobe-DH-1 Fire Alarm Bell-DH-1 Air outlet window Air outlet window Extinguishant Control Panel-DH-1 Horn Strobe-DH-2 Abort Switch-DH-1 Warning Signs-DH-1...
  • Page 49 NO.S019 Combined Module Aisle Door Installation Position Diagram DKBA61777720.ASM Sliding door With accessories...
  • Page 50 NO.S020 Position Diagram for Internal Cable Trays Between Combined Pre-fab. Modules 1. Aluminum profile cable tray 2. Mesh cable tray 4. Front aluminum profile cable tray 3. Optical fiber cable trough DKBA61595926.ASM Front aluminum profile cable tray With connector DKBA83117985.ASM Optical fiber cable trough With connector DKBA61595925.ASM...
  • Page 57 NO.S021 Busway Suspender Installation Position Diagram (A1 Module) GB9074_13-88_M6X16 Note: 1. Install the upper corner fittings of the suspenders in the following sequence: Install the lower-layer straight section corner fittings of the suspenders, as shown in the figure. Install the upper-layer straight section corner fittings of the suspendiers, as shown in the figure. DKBA04853262_E-1 Connecting plate GB9074_13-88_M6X16...
  • Page 58 NO.S021 Busway Suspender Installation Position Diagram (A2 Module) GB9074_13-88_M6X16 Note: 1. Install the upper corner fittings of the suspenders in the following sequence: Install the lower-layer straight section corner fittings of the suspenders, as shown in the figure. Install the upper-layer straight section corner fittings of the suspendiers, as shown in the figure. Connecting plate DKBA04853262_E-1 Screw...
  • Page 62 NO.M005 Monitoring Device Installation Position Diagram Monitoring Wiring diagram of Access Actuator POE_ male female BLACK BLACK BLACK BLACK Magnetic Lock Magnetic Lock YELLOW YELLOW YELLOW YELLOW BLACK female male female male BLACK GATE BLACK LOCK Access Actuator BLACK WHITE BLUE BLACK Module Emergency Button...
  • Page 63 IT Rack-B9: Guide Rail Config Rack front Rack back Collector_ECC800-DH-1 L Type Guide Rail Cable Tray LAN Switch-DH-1 L Type Guide Rail Cable Tray Cable Manager VCN-DH-1 L Type Guide Rail Sever-DH-1 L Type Guide Rail 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel...
  • Page 64 IT Rack-A1~IT Rack-A9;IT Rack-B1~IT Rack-B8 Guide Rail config Rack front Rack back Cable Tray Cable Tray 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel 1U Filler Panel Cable Manager 1U Filler Panel 1U Filler Panel...
  • Page 65 Power Room-A Guide Rail config Rack front Rack back LAN Switch-DH-2 L Type Guide Rail Cable Tray Collector_ECC800-PR-A1 L Type Guide Rail UIM20A-PR-A1 Cable Tray RPDU UIM20A-PR-A2 RPDU Power Room-B Guide Rail config Rack front Rack back Collector_ECC800-PR-B1 L Type Guide Rail Cable Tray UIM20A-PR-B1 Cable Tray...
  • Page 66 NO.F005 Fire Extinguishing System Onsite Wiring Diagram Window CB-PR-B1 Input Output Code No. Description Unit Module Input device Module Output device A101 Smoke Detector-DH-3 A102 Electronic|Electric Cable,300V,UL3385,16AWG,Tin Plating,Black,LSZH,UL Smoke Detector-DH-5 25033402 Install VCN onsite. A101 Smoke Detector-DH-3 A102 Smoke Detector-DH-5 25033402-005 Electronic|Electric Cable,300V,UL3385,16AWG,Tin Plating,Red,LSZH,UL A101 Heat Detector-DH-3...
  • Page 67 NO.M006 Monitoring Onsite Wiring Diagram Monitoring Wiring diagram of NMW ECC800 BACK Collector_ECC800P Air outlet window LANSWITCH Window CB-PR-A1 Technical Requirements Notes: 1. Network ports are connected using network cables. 2. Both ends of the network cable are RJ45 connectors. 3.
  • Page 74 NO.S022 Fire Retardant Bag Installation Position Diagram B direction view Fire retardant bag installation Brush E E sectional view A direction view Position for installing fire retardant bags...
  • Page 75 NO.S023 Return Air Suspended Ceiling Installation Solution 6. Blind plate clamping 7. Blind plate clamping corner 2 corner 1 5. Blind plate 4 8. Combination ceiling keel 4. Blind plate 3 3. Blind plate 2 2. Blind plate 1 9. Combination blind plate 5 10.
  • Page 76 NO.F001 Fire Extinguishing Device Layout Diagram (CE) Window CB-PR-B1 Exit-DH-3 127/98KG EXIT 38L/26KG...
  • Page 78: Removing Transport Protection Materials

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) 4 Removing Transport Protection Materials Removing Transport Protection Materials Table 4-1 Protection materials to be removed Device Protection Materials to Be Removed Smart cooling product Transport fastener for the...
  • Page 79: Initial Configuration Parameters

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) 5 Initial Configuration Parameters Initial Configuration Parameters Issue 01 (2021-01-05) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: A Common Torque Selection Table

    FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) A Common Torque Selection Table Common Torque Selection Table NO TE This table lists only the recommended torque for common screws, bolts, and pipe connectors. The torques you choose should meet project requirements.
  • Page 81 List of Initial Configuration Parameters Detailed Initial Configuration Category Diagram ID Diagram Name Parameters Power Distribution Device Layout NO.P001 Diagram Power Distribution System NO.P002 Diagram Initial 8D ATS Initial Configuration Parameters Configurations for the Power Supply and Distribution MCCB Current Parameter Settings Initial Configuration Parameters System Table 1...
  • Page 84 备 Device Name Project Configuration Quantity Power Distribution Device Name Remarks 注 8D ATS ■Involved □Not involved MDB-A/MDB-B UPS5000-E ■Involved □Not involved ME UPS-A/ME UPS-B/IT UPS-A/IT UPS-B ME UPS BAT-A/ME UPS BAT-B/IT UPS BAT-A/IT SmartLi ■Involved □Not involved UPS BAT-B 热...
  • Page 85 Component MDB-A/MDB-B ABB 8D ATS Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks Password 0001 Default value 100/57 V-115/66 V-120/70 V-208/120 V-220/127 V-230/132 Rated Voltage 400/230 V V-240/138 V-277/160 V-347/200 V-380/220 V-400/230 V- 415/240 V 415/240 V-440/254 V-480/277 V Rated Frequency 50 Hz 50 Hz, 60 Hz...
  • Page 86 Category Parameter Default Value Value Range Setting Remarks Freq Hysteresis Min LN1 -3.0% -9.8% to -0.8% -3.0% Freq Hysteresis Min LN2 -3.0% -9.8% to -0.8% -3.0% Frequency Hysteresis Freq Hysteresis Max LN1 +3.0% +0.8% to +9.8% +3.0% Freq Hysteresis Max LN2 +3.0% +0.8% to +9.8% +3.0%...
  • Page 87 Component ME UPS-A/ME UPS-B/IT UPS-A/IT UPS-B UPS5000-E-(50kVA–300kVA) Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks Advanced Param. System capacity 1.0.0.0– IP address 192.168.0.10 Default value 223.255.255.255 0.0.0.0– Subnet mask 255.255.255.0 Default value 255.255.255.255 IP Setting 1.0.0.0– Gateway 192.168.0.1 Default value 223.255.255.255...
  • Page 88 Category Parameter Default Value Value Range Setting Remarks ≤ 1000, 1000–2000, ≤ 1000 Altitude (m) 2000–3000, Default value 3000–4000, 4000–5000, Top outlet fan Disable Enable/Disable Disable Dust-proof maintenance period (d) 0–365 Depends on the default number of power modules. The System Settings Intra-rack power mode default value is 2.0, 1.0, and...
  • Page 89 Category Parameter Default Value Value Range Setting Remarks Bypass voltage upper limit voltage level is 415 V +10% +10%, +15% Default value -10%, -15%, - 20%, -30%, - Bypass Parameters Bypass voltage lower limit -20% Default value 40%, -50%, - Bypass frequency range (Hz) ±2 Hz ±0.5 Hz to ±6 Hz...
  • Page 90 Component ME UPS BAT-A/ME UPS BAT-B/IT UPS BAT-A/IT UPS BAT-B SmartLi Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks R IP address allocation Automatic Automatic, Manual Default value IP address 192.168.0.10 1.0.0.0–223.255.255.255 Default value IP Settings Subnet mask 255.255.255.0 0.0.0.0–255.255.255.255 Default value...
  • Page 91 MDB-A 2QF3/MDB-A 2QF4/MDB-B 2QF3/MDB-B Component 2QF4/GIU-DH-A1 QF/GIU-DH-A2 QF/GIU-DH-B1 QF/GIU-DH-B2 QF MCCB Current Parameter Settings Category Parameter Default Value Value Range Setting Remarks Pyromagnetic MCCB current setting Pyromagnetic MCCB current setting MAX, MED, MIN...
  • Page 95 Initial Teamwork Configuration Parameters for 55 kW Air Cooled Smart Cooling Product Number of Number of running Hot aisle Enable smart Cold aisle Teamwork Teamwork Networking smart Rotation Rotation Rotation Forced Requirement Cascade temperature Room conditioner Teamwork cooling temperature and conditioner group No.
  • Page 96 Initial Temperature and Humidity Configuration Parameters for 55 kW Air Cooled Smart Cooling Product Humidity deadband Temperature and humidity control Control point humidity (Administrator can Room Air conditioner Temp control mode Control point temperature setpoint type change it in setpoint advanced settings.) CRAH-DH-A1 Supply air...
  • Page 97 Initial Configuration Parameters for Ventilation Window Electric Heater DIXELL XR02CX Thermostat Category Setting Item Default Value Setting Threshold Factory Setting Remarks Set Point -55 - 99 °C 25° C Differential 2.0° C 0.1 - 25 °C 20° C Anti-short cycle delay 0 - 50 min Adjusting Parameters Compressor ON time faulty probe...
  • Page 98 NO.M001 Monitoring Device Layout Diagram Window CB-PR-B1...
  • Page 99 NO.M002 Monitoring System Networking Diagram IP Camera-DH-7 Reserved Reserved IP Camera-DH-6 Reserved Reserved Reserved IP Camera-DH-5 Reserved Reserved Reserved IP Camera-DH-4 Reserved Reserved Reserved Reserved Reserved IP Camera-DH-3 IP Camera-DH-2 VCN-DH-1 Reserved IP Camera-DH-1 Reserved LAN Switch-DH-1 LAN Switch-PR-A1 Server-DH-1 IP Camera-PR-A1 Reserved Reserved...
  • Page 100 Table 3 Initial Configuration Parameters for the Management System Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device...
  • Page 101 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port User name: admin LAN Switch- LAN Switch- Initial IP:192.168.0.120...
  • Page 102 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port User name: User name: admin admin LAN Switch-...
  • Page 103 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port Collector_ECC8 NMW-125A4-6/0- 02312RHL PDU-DH-A1-2 FE_1...
  • Page 104 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port Temperature: ≤ 10C, ≥...
  • Page 105 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port Collector_ECC8 Access Controller-PR- RS485 02070199 A8802RS...
  • Page 106 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port Normal: Collector_ECC8 Crimping 52250216 FAULT RELAY...
  • Page 107 Upper- LCD User Port to Monitoring Data Device Device IP Device WebUI User Name Upper-Level Level Device Name Device Model Alarm Threshold Name and Upper-Level Remarks Device Type Code Address Address and Password Device Device Password Device Port Collector_ECC8 Normal: closed Crimping MDB-B_SPD1 UIM20A-PR-B1...
  • Page 108 Number of hard disks extra configured for the VCN520: 1 Remarks: After a camera is commissioned, label the camera with its name and IP address. Remarks: Whether the optional functions of the NetEco software are configured Function Yes/No Energy efficiency management Mobile app O&M 3D view...
  • Page 109 NO.F001 Fire Extinguishing Device Layout Diagram (CE) Window CB-PR-B1 Exit-DH-3 127/98KG EXIT 38L/26KG...
  • Page 110 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 111 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 112 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 113 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 114 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 115 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 116 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 117 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 118 NO.F002 Fire Extinguishing System Conceptual Diagram (CE)
  • Page 120 NO.F003 Emergency Exit Diagram Window CB-PR-B1 Exit-DH-3 EXIT...
  • Page 121 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) A Common Torque Selection Table Item Tightening Torque (Tolerance: ±10%)/ (Unit: Kgf.cm) Cross Electric recessed screwdriv pan head thread forming screw Cross Pneumati recessed counters screwdriv unk head...
  • Page 122 FusionDC1000B Prefabricated Modular Data Center Quick Guide (2020, Nigeria, Platform Capital Refinery DC) A Common Torque Selection Table Item Tightening Torque (Tolerance: ±10%)/ (Unit: Kgf.cm) ST4.8 Cross Pneumati 30 (for recessed checking, pan head screwdriv not for self- tightenin drilling...