Operation Manual / A150-M56/66/57/67 - A155-M..
10 Dismantling and fitting with removed air inlet and gas outlet / 10.13
Installing the compressor casing
Installing the compressor casing
Fig. 73: Installing the compressor casing
Product
A150
A155
Table 52: Tightening torque (72011)
1. Fit new O-ring (42012).
2. Thoroughly clean the fastening strips (72012) before assembly.
3. Install the compressor casing (72000).
4. Install the fastening strips (72012) with screws (72011). Observe the tightening torque.
© Copyright 2021 ABB. All rights reserved.
Size
Tightening torque [Nm]
M16
M18
HZTL4032_EN
275
370
Rev.R
August 2021