hit counter script
Download Print this page

Vectaire EVO350DC Installation Maintenance And Operating Instructions

Whole house heat recovery unit with low energy dc motor and lcd control

Advertisement

Quick Links

EVO350DC
Whole House Heat Recovery Unit
with Low Energy DC Motor
and LCD control
for domestic and commercial use
Installation, Operating and Maintenance
Instructions

Advertisement

loading

Summary of Contents for Vectaire EVO350DC

  • Page 1 EVO350DC Whole House Heat Recovery Unit with Low Energy DC Motor and LCD control for domestic and commercial use Installation, Operating and Maintenance Instructions...
  • Page 2 Vectaire will not be held responsible and will not accept liability for any dam- age caused to persons or property through failure to follow the guidance provided in this manual. It should always be available with the product for easy reference.
  • Page 3 Page 3 IT IS IMPORTANT THESE THESE INSTRUCTIONS ARE READ FULLY BEFORE INSTALLATION • This product should not be used for any purpose other than that for which it was designed and as shown in this leaflet. • All packaging should be removed and the unit checked for damage in transit.
  • Page 4 Page 4 Condensation (The unit may sometimes produce condensation which must be drained away. A 15mm dia pipe connection is provided on this unit). • A 15mm dia pipe must be fitted to the pipe connection. If any part of the condensate drain is in an unheated space it MUST be insulated with the equivalent of at least 25mm of insulating material with a thermal conductivity of 0.04 W/(mK).
  • Page 5 • Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be dis- connected. The air filters and heat exchanger of the Vectaire EVO350 should be cleaned regularly by a suitably qualified person (the frequency of cleaning will vary depending on the installation environment). Filters should be replaced after a max- imum of 3 cleaning cycles.