Mechanical operation counter moc - e2.2-e4.2-e6.2 (4 pages)
Summary of Contents for ABB SACE Emax 2
Page 1
DOC. N° 1SDH002083A1002 - ECN000119014 - Rev. A SACE Emax 2 Emax2 E4.2 MS/DC-E low voltage air switch-disconnectors Installation, operation and maintenance instructions for the installer and the user...
Putting into service and maintenance ........38 1 - Putting into service ............38 References ..................4 Introduction ................ 38 1 - ABB documentation mentioned in this manual ....4 General checks ..............38 Check accessories .............. 39 Emax E4.2 circuit-breakers ............5 Final check list ..............
All the remaining operations described in the handbook must be performed by skilled persons, in the electrical field. ABB declines all liability for damage to persons or property caused by failure to comply with the instructions in this document.
• these warnings and alarms do not include all conceivable ways to make installation, use and maintenance recommended by ABB or not, that may be made, or possible consequences and complications of each conceivable way, nor shall ABB investigate all those ways.
ABB | SACE Emax 2 3 - Regulations Standards Sace Emax 2 MS/DC-E series circuit-breakers conform to international standards: • IEC 60947-3 • EN 60947-3 • UL 489F • UL 489B • GB/T 14048.3 They comply with the following EC directives: •...
ABB | SACE Emax 2 Management operations 1 - Transport and checking on receipt Introduction In view of their weight, Sace Emax 2/MS 1500 V DC series switch disconnectors require particular care during transport and handling. They are distributed with following packages: •...
Damage and Discrepancy If there is any damage to the packaging upon receipt and / or inconsistencies between order and product identification label or product please contact ABB. Damage to the packaging must be reported no later than Report seven days from receipt of the material.
Mounting the fixed part of the Fasten the fixed part to a horizontal surface using four M8 × 25 screws. The screws are supplied by ABB. See Figure 56. Tighten the screws with tightening torque = 21 N m - 186 lb in.
WARNING! in the presence of an undervoltage coil the circuit-breaker can be closed only after the trip unit is energized NOTE: for safety reasons, ABB strongly advises you to change the password right from the first access and to keep it with care.
ABB declines all liability for damage to persons or property caused by failure to comply with the instructions in this document. Circuit-breaker life The circuit-breakers SACE Emax 2, with or without opening or closing coils, can withstand the following operating cycles if regularly serviced. For further information see chapter 4 - Environmental conditions on page 25.
ABB | SACE Emax 2 Maintenance schedule Proper maintenance of the equipment allows good electromechanical operation to be maintained over time. The maintenance plan for SACE Emax 2 circuit-breakers specifies two periodic levels of maintenance for the different types of site conditions.
-> OK Figure 84 - Checking the breaking gaps Close the circuit-breaker and check dimension A. Contact ABB Sace (*) if dimension A is incorrect. If dimension A is correct, open the circuit-breaker again and re-assemble the arc chutes.
ABB | SACE Emax 2 6 - Decommissioning and treatment at end of life Safety standards During the early stages of the process of decommissioning and end of life treatment of SACE Emax 2 circuit- breakers, observe the following safety rules: •...