Page 1
Hitachi-HT7700 TEM Operation No magnetic samples!!! No Organic/bio samples!!! Initial conditions: o Check Vacuum system (2X10-6 or better) o HV On Check of Specimen Stage Coordinates For loading a specimen, the specimen stage should be at the coordinate location (home position).
Page 2
- turn the “EVAC-AIR” switch to “AIR”, wait for about 10 seconds (Two sounds) - remove the sample holder (avoid touching the sample holder beyond the O-ring) Load your sample Do not touch to the left of the O-ring for this is the vacuum side of the holder. Fix the holder with the holder fixing table.
Page 3
- flip up the “EVAC-AIR” switch to “EVAC” - Pumping will be complete when the green lamp is lit and makes an alarm sound, (The green lamp is lit for about 10 seconds. During this period of time, the lock mechanism is released)- turn the specimen holder clockwise 30°;...
Page 4
Turn on the filament/beam (a) Turn on the filament voltage (if the filament voltage is off) - “Operation” -> “HV/Filament Operation” - click “Filam. on”, it takes about 30 seconds (b) Turn on the beam - Select Auto mode, click “Beam On” under Auto mode, the filament current will automatically turn on and turn off when you loading or remove the sample holder (c) Click Run, to turn on the screen camera.
Page 5
Center the Beam (if the beam is not centered) Push the “BH” button, adjust the Beam centre by using the X, Y knobs on the operation panel. Start acquiring TEM images (Please always keep attention to the exposure intensity) (a) Find your sample using the Screen camera (Left display) You can use HC (>0.2K) mode to search your sample at the beginning, then change to HR mode (>...