Operation Manual / TPS44-H.. - TPS52-H..
10 Dismantling and fitting / 10.2 Material required
10.2
Material required
Customer spare part set
Before starting operations, make sure the required customer spare part set is available (see
chapter
Spare parts
→98).
Customer tool
Before starting work, make sure the required tool is available (see chapter
Not all tools are marked with a part number. Identification is guaranteed by the tool list. This
list is enclosed with the tool set.
WARNING
Servicing the tools
The tools must be checked for damage before and after use.
Visually inspect for corrosion, cracks, deformation and wear.
u
Damaged tools must no longer be used and must be replaced.
u
Swivel lifting eyes
One swivel lifting eye (S) is required to safely lift this turbocharger. This is not included in
the ABB scope of delivery.
Fig. 23: Swivel lifting eyes
Product
Thread M
TPS44
M8
TPS48
M8
TPS52
M10
Table 32: Swivel lifting eyes to be used
Ring nuts
Two ring nuts are required for safer lifting of the cartridge group, which are not included in
the ABB scope of delivery.
© Copyright 2021 ABB. All rights reserved.
Length H
Diameter D
[mm]
[mm]
≤ 12
≤ 25
≤ 12
≤ 25
≤ 15
≤ 25
HZTL4037_EN
Tools
→107).
Minimum load limit
[kg]
300
300
400
Rev.G
June 2021