Operation Manual / TPS44-H.. - TPS52-H..
6 Operation and service / 6.3 Expected replacement intervals
Component
Turbine casing
Nozzle ring
Heat sheet metal
Rotating components
Bearing parts
Other casings
Table 12: Expected replacement intervals
GAS
= Gas
MDO
= Marine Diesel Oil
1)
The recommended replacement intervals of the compressor and turbine wheels are spe-
cified with the aid of the safety concept for rotating parts (SIKO) and dependent on the
operating conditions.
Influencing parameters
The specified values are guideline values and are not guaranteed. The actual values can devi-
ate significantly from the guideline values, for example, due to the following influences:
¡
Fuel quality and fuel treatment
¡
Load profile (thermal cycling, also number of starts/stops, emergency shutdowns, oper-
ating point)
¡
Gas inlet temperature
¡
Turbocharger specification
¡
System-specific operating conditions (combustion quality, exhaust gas composition)
For bearing parts
¡
Lubricating oil quality (oil filtering, oil condition, oil monitoring)
¡
Load profile (speed, pressure conditions, temperature)
¡
Number of starts/stops
¡
Unbalance of the rotor (degree of contamination).
© Copyright 2021 ABB. All rights reserved.
Operating hours [h]
(GAS / MDO)
25000 ... 50000
25000 ... 50000
25000 ... 50000
See rating plate information
12000 ... 24000
50000
HZTL4037_EN
Number of engine start cycles
(Peak shaving mode)
5000 ... 10000
5000 ... 10000
5000 ... 10000
1)
20000
5000
- -
Rev.G
June 2021