Operation Manual / 1 Introduction
1 Introduction / 1.3 Storage of new turbochargers and spare parts
Long-term storage of turbochargers
The turbochargers will be prepared for prolonged storage by ABB Turbo Systems on re-
quest. The package is equipped with a hygrometer (see illustration).
Fig. 3: Package with hygrometer
The following measures are required every 6 months:
Check the hygrometer (02) in the sight-glass. There is an opening (01) in the wooden
u
crate which allows this check to be carried out. When the display field has changed colour
at the 70% level, the maximum permissible humidity has been exceeded. In this case the
turbocharger must be inspected by an ABB Turbocharging Service Station and repacked.
Inspect the package for damage. If the package is damaged, the turbocharger must be in-
u
spected by an ABB Turbocharging Service Station and repacked.
After every 3 years the following work steps must be performed by an ABB Turbocharging
Service Station:
¡
Inspect the components
¡
Replace the desiccant agent
¡
Repackage the components.
If the 70% display field of the hygrometer (02) has not changed colour and the package is
undamaged, the turbocharger can be placed into operation without any prior testing by an
ABB Turbocharging Service Station.
Unpacking turbochargers
The corrosion protection effect ends after the material is unpacked from the VCI package.
To avoid the formation of condensation, the surroundings and the content of the package
must have the same temperature during unpacking.
© Copyright 2020 ABB. All rights reserved.
HZTL4005_EN
Rev.G
March 2020