hit counter script

Installing The Turbocharger - ABB HT564896 Operation Manual

Table of Contents

Advertisement

7.3
7.3
CAUTION
NOTICE
© Copyright 2016 ABB. All rights reserved.
Removal and installation

Installing the turbocharger

Installing the turbocharger
Remove the cover from the oil connection.
Inspect the lifting gear.
Fasten the lifting gear to the suspension lugs on the bearing casing
and the turbine-end foot.
Oil orifice plates
An orifice plate for adjusting the oil pressure is fitted in each of the two
oil inlet channels in the bearing casing. When the cartridge group, the
bearing casing or the turbocharger is fitted to the engine, it must be
ensured that the orifice plates that are specified for the turbocharger
have been installed in the two oil inlet channels.
Check correct installation of oil orifice plates.
Fit the turbocharger to the engine.
Tighten the fixing screws on the foot.
The fastening specifications for the foot fixing screws are supplied to
the engine builder by ABB Turbo Systems and given in his manual.
Fasten the gas, air and oil lines in accordance with the engine
builder's instructions.
Version with compressor wheel cooling system
Fit the air supply line (also see the chapter entitled Preliminary
remarks / Layout and functioning).
Plug in the cable connector on the speed sensor.
Operation Manual / TPL76-C
7
7.3
Page 88

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl76-c35

Table of Contents