hit counter script

Commissioning - Siemens AKE 200 Manual

Smart communication coupling unit
Table of Contents

Advertisement

1.4

Commissioning

!
DANGER
All safety notes as described must be observed.
²
!
DANGER
The cross section of the ground wire and the laying of the wire must comply with the regulations
²
applicable for the place of installation.
Connect the device with a solid low-resistance to earth. Observe local installation conditions
²
During operation it is necessary to check the resistance to earth cyclically
²
Attention! The diameter of earthing connection should at least have the same diameter or greater than
²
the diameter of connection between coupling capacitor and AKE 200
Smart Communication, AKE 200 Coupling Unit, Manual
C53000-G6540-C265-2, Edition 11.2020
5 Technical Data
Safety and Installation Instructions

1.4 Commissioning

9

Advertisement

Table of Contents
loading

Table of Contents