hit counter script

Powering On Your System - NEC ES1400 User Manual

Table of Contents

Advertisement

Powering On Your System

Power on your system as follows.
1. Make sure all external devices, such as a video display, keyboard,
and mouse (optional) have been connected, and the power cords are
connected.
2. Power on the video display and any other external devices.
3. Press the push-button power on/off switch on the front panel. Verify
that the power-on LED is lit. If it is not lit, ensure the ac power cords
are connected to a functional ac power source.
After a few seconds your system begins the internal Power-On Self Tests
(POST). POST automatically checks the system board, CPU module,
memory, keyboard, and most installed peripheral devices.
Always allow POST to complete before powering down your
system.
The server management logic on your system board monitors
and logs system voltage changes. When powering down your
system you may experience a
1–5 second delay from the time you press the push-button
power on/off switch on the front panel and your system
powering down. This is normal system operation and is
required by the server management logic.
If you have problems powering on your system, refer to Problem Solving
in Chapter 5 of this User's Guide.
After you have successfully powered on your system, insert the
E
XPRESS
and follow the screen prompts to run E
! CAUTION
! CAUTION
B
CD-ROM into the CD-ROM device, reboot the system
UILDER
B
.
XPRESS
UILDER
Setting Up the System 2-11

Advertisement

Table of Contents
loading

Table of Contents