hit counter script
Download Print this page

GE JKS10 Installation Instructions Manual page 4

Built-in wall oven 27" (68.6 cm) & 30" (76.2 cm) models
Hide thumbs Also See for JKS10:

Advertisement

Available languages

Available languages

Installation instructions
Cutout for 27" (68.6 c )Single
Ovens on y
For JKS10, JKP30, JKP70, PK916, ZEK938 models only.
uilt-ln
Allow 1" (2.8 era)
for overlap of
oven over side
edges of cutout
2" x 4"
(Scmx
tOcm)
runners
level
with
bottom
of cutout
20" (50.8 era)
"
Allow"
1" (2.5
cm)
Allow a minimum
minimum
for
ciearance°f
20" (50.8teCta),41
_
for
overlap
of
a_jacen,
oven top and
corners,
drawers,
wails,
bottom
etc. when door is open
of cutout'_"'_--_
5" (12.7 cm)
Max. from the
left or right
Cabinet_
_sk
!_
Junction
Box
/
Location
I
27"
(68.6
cm)
i
Cutout
Width
/_
25" (63.5 cm)
Min.
j
,, : ,,
25 114" (64.1
"!-'
Max.
Cutout
Height
22" (55.9 cm)
27 5/8"
Min. above
(70.2 cm) Min. base rail
28 118"
I
Box Location -
access
from
adjacent
cabinet
Recommended
may be required
cutout
location
from Roor 32 1/2"
(82.6
cm)
Cabinet
Width
Recommended
Cutout
Location
from
Floor
Cutout
Depth
Cutout
Width
Cutout
Height
27" (68.8 cm)
32 1/2" (82.6 cm)
23 1/2"
(59.7 cm) Min.
25" (63.5 cm) Min.
25 1/4" (64.1 cm) Max.
27 5/8" (70.2 cm) Min.
28 1/8" (71.4 cm) Max.
NOTE: if the cabinet
does not
have a front
frame and the sides
are less than 3/4" (1.9 cm) thick,
shim
both sides
equally
to
establish
the cutout
width.
If the cabinet
does not have a solid
bottom,
two braces
or runners
must be installed
level with the bottom
of the cutout
to
support
the weight
of the oven.
For
single
ovens,
the runners
and braces
must support
150 Ibs (68 Kg).
NOTE: If marks,
blemishes
or the
cutout
opening
are visible above
the
installed oven,
it may be necessary
to
add wood
shims
under the runners
and
front
trim until the marks
or opening
are
covered,
2" x 4" (5 cmx
tO cm) or
equivalent
runners
love|
with
bottom
of cutout
T
24"
(61 cm)
1
I-'_- 18" (45.7 cm) "-_1
"_
27" (68,6 cm) "_
These ovens are not approved
for
stackable
installations.
4

Advertisement

loading