hit counter script

Combustion Blower; Junction Box - Yukon SJ125 Owner's Manual

Super jack & big jack wood burning furnaces
Table of Contents

Advertisement

Combustion Blower

Remove the three (3) self tapping screws off the front
of the furnace. (Set aside) Line up the gasket to the
mounting flange of the combustion blower and using
the 3 screws, tighten onto the front of the furnace.
See Fig. 3
4x4 Junction Box
Big Jack
Attach the junction box with the transformer/relay to
the mount provided at the top right hand side of the
front of the furnace. See Fig. 4
Note: BJ90-C (Canada)
Attach by mounting the junction box onto insulated
panel and place screws into two holes pre-punched
into panel casing.
Super Jack
Attach the junction box with the transformer/relay to
the mount provided at the bottom right hand side of
the front of the furnace. See Fig. 5
FIG. 4
Installation

Junction Box

Mounting Bracket
Big Jack
FIG. 3
Combustion Blower
FIG. 5
Junction Box
Mounting Bracket
22
Super Jack

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bj90Super jack sj125Big jack bj90

Table of Contents