hit counter script
GE GDT550HGD0BB Installation Instructions Manual

GE GDT550HGD0BB Installation Instructions Manual

Built-in dishwasher
Hide thumbs Also See for GDT550HGD0BB:

Advertisement

Available languages

Available languages

,i:::::i!iZi
I¸ _ i:!!!!!!!
¸'¸ ii _iiii:::_,iii::::_,i'
,J,i:::::i_
;':_ c :e ::!::iiiiii:
Installation Instructions
Built-In Dishwasher
If gou have questions, call 800.GE.CARES1800.432.27371 or visit our Website at: GEAppliances.com.
In Canada, please call 1.800.561.3344 or visit www.geappliances.ca
BEFORE YOU BEGIN
Read these instructions
completely
and
carefully.
I M PORTANT
- Observe all governing codes and
ordinances.
• Note to Instoller
- Be sure to leave these instructions
for the
consumer's
and local inspector's
use.
• Note to Consumer
- Keep these instructions
with your
Owner's
Manual for future reference.
• Skill Level - Installation
of this dishwasher
requires
basic mechanical,
electrical
and plumbing
skills. Proper
instollotion
is the responsibility
of the instoller.
Product
failure due to improper
instollotion
is not covered
under
the GE Applionce
Worronty.
See worronty
informotion.
• Completion
Time - i to 3 Hours. New installations
require
more time than replacement
installations.
I M PORTANT
- The dishwasher MUST be installed
to allow forfutureremoval from the enclosureif serviceis
required.
Care should be exercisedwhen the applianceisinstalled or
removed, to reduce the likelihood ofdamage
to the power
supplycord.
If you receiveda damaged
dishwasher, you should immediately
contactyour dealeror builder.
OptionalAccessories- See the Owner's Manual foravailable
custom panel kits.
FOR YOUR SAFETY
Reod ond observe
ell CAUTIONS end WARNINGS shown
throughout
these instructions.
While performing
instollotions
described
in this booklet,
gloves, sofety
glosses
or goggles
should
be worn.
/
READ CAREFULLY.
KEEP THESE INSTRUCTIONS.
31-31506-1
06-12
GE

Advertisement

Table of Contents
loading

Summary of Contents for GE GDT550HGD0BB

  • Page 1 ,J,i:::::i_ ;':_ c :e ::!::iiiiii: Installation Instructions Built-In Dishwasher If gou have questions, call 800.GE.CARES1800.432.27371 or visit our Website at: GEAppliances.com. In Canada, please call 1.800.561.3344 or visit www.geappliances.ca BEFORE YOU BEGIN I M PORTANT - The dishwasher MUST be installed...
  • Page 2: Materials You Will Need

    Installation Preparation PARTS SUPPLIED IN INSTALLATION PACKAGE: [] Junction box cover and #10 hex-head screw Hose clamp HoseClamp Junction Hex-Head Drain Hose Drain hose (approximately 78" long) Box Cover Junction Drain hose hanger Box Screw [] 2 side trim pieces (some models) Drain HoseHanger 112"...
  • Page 3 Installation Preparation PREPARE DISHWASHER ENCLOSURE AWARNING: To reduce the risk of electric shock, fire, or injury to persons, the installer must ensure that the dishwasher is completely enclosed at the time of installation. -A ADVERTENCIA: This Wall Area must be Free Para reducir el riesgo de descarga el_ctrica, incendio o lesiones a of Pipesor personas, el instalador debe asegurarse de que el lavaplatos est_...
  • Page 4 Installation Preparation PREPARE ELECTRICAL WIRING Receptacle -AWARNING: t _'_ Alternate Location FOR PERSONAL SAFETY: Remove house fuse or open circuit breaker beforebeginning installation.Do not usean extensioncord or adapter plug with this appliance. -A ADVERTENCIA: Cabinet PARASEGURIDADPERSONAL: Q uite el fusible o abra el interruptor de circuitos antes de comenzar la instalaci6n.
  • Page 5: Prepare Hot Water Line

    Installation Preparation PREPARE HOT WATER LINE -ACAUTION: • The line may enter from either side, rear or floor within the Do not remove wood base until you are ready to install the shaded area shown in Figure F. dishwasher. The dishwasher will tip over when the door is •...
  • Page 6 Dishwasher Installation STEP 1: PREPARATION STEP 3: REMOVE WOOD BASE, INSTALL LEVELING LEGS Locate the items in the installation package: • Screws IMPORTANT • Junction box cover - Do not kick offwood base! • Drain hose and clamp Damage will occur. •...
  • Page 7: Step 5: Install 90 ° Elbow

    Dishwasher Installation STEP 5: INSTALL 90 ° ELBOW STEP 7: POSITION WATER LINE AND HOUSE WIRING • Wrap a 90 ° elbow with Front of Dishwasher thread seal tape. • Position water supply line and house wiring on the floor of the •...
  • Page 8 Bend and break Screw --_,-_. Jhere if necessary Figure P If you would like to order the Trim Kit from GE Service, ple(]se c(]l1800.6E.Cares (]nd request port number WD08XlO094 for _Bracket BB models or WDO8X10096 for WW or CC models.
  • Page 9: Step 12: Push Dishwasher Into Final Position

    Dishwasher Installation STEP 12: PUSH DISHWASHER INTO STEP 13: LEVEL DISHWASHER FINAL POSITION I M PORTANT - Dishwasher must be level f orproper • Check the tub insulation blanket, if equipped, to be sure it is dishrackoperation, wash performance and dooroperation. smoothly wrapped around the tub.
  • Page 10 Dishwasher Installation STEP 15: CONNECT WATER SUPPLY STEP 14: POSITION DISHWASHER, SECURE TO COUNTERTOP OR CABINET Connect water supply line to 90 ° elbow. • Slide compression nut, then ferrule over end of water line. In this step you will need the 2 Phillips special head screws •...
  • Page 11: Step 17: Connect Power Supply

    Dishwasher Installation STEP 16: CONNECT DRAIN LINE (Cont.) STEP 17: CONNECT POWER SUPPLY Ifa power cord with plug is alreadg installed proceed to • Connect drain line to air gap, waste tee or disposer Step 18. using the previously determined method. Secure hose with a screw-type clamp.
  • Page 12: Step 18: Pretest Checklist

    Dishwasher Installation STEP 18: PRETEST CHECKLIST STEP 19: DISHWASHER WET TEST Review this list after installing your dishwasher to avoid [] Turn on power supply or plug power cord into outlet, charges for a service call that is not covered by your if equipped.
  • Page 13: Step 20: Replace Toekick

    Dishwasher Installation STEP 20: REPLACE TOEKICK STEP 21: LITERATURE • Place toekick against the legs of the dishwasher. • Be sure to leave complete literature package, these Installation Instructions and product samples and/or coupons with the consumer. Screws Figure CC •...
  • Page 14 Notes...
  • Page 15 Notes...
  • Page 16 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE GEAppliances General Electric Company Louisville, Kentucky/40225 GEAppliances.com © 2012 General Electric Company...
  • Page 17: Avant De Commencer

    6 une installation inod@quote West pos couverte par Io (ATTENTION et AVERTISSEMENT} donn@es duns les pr@sentes gorontie de GE.Reportez-vous 6 Io gorontie du produit. directives. Pour effectuer I'instelletion d@crite dens les • Dur_e de I'instollotion - Entre i et 3 heures. L'installation...
  • Page 18 Preparation pour I'installation PII CES FOURNIES DANS L'EMBALLAGE: [] Couverclede la boTte dejonction et visa t#te hexagonale n° 10 Vis 6 t_te Collier Couvercle Bogau de vidange [] Collier de la bo?te hexagonale n° 10 [] Boyaude vidange (198 cm/78 po de long) de 12,7 mm (1/2 po) dejonction [] Support de tuyau de vidange)
  • Page 19 Preparation pour I'installation PRI PARATION DE L'OUVERTURE DANS ./k AVERTISSEMENT: LES ARMOIRES Pour r_duire les risques de choc _lectrique, d'incendie ou de blessures, I'installateur doit s'assurer que le lave-vaisselle compl_tement encastr_ au moment de I'installation. Le lave-vaisselle doit _tre install6 de fagon 6 ce que le boyau de vidange mesure au maximum 3.66 m_tres (12 pieds) pour Lemur du fond...
  • Page 20 Preparation pour I'installation DU CABLAGE PREPARATION ELECTRIQUE t'i- Autreemplacement z" _ possible pourlo AVERTISSEMENT: I prise de courant POURVOTRESECURITE PERSONNELLE: Enlevez le fusible ou 4 t- 46 cm (18po) d@clenchez le disjoncteur au panneau de distribution principal "Trou de 3,8 cm avant de commencer I'installation.
  • Page 21 Preparation pour I'installation PRI_PARATION DE L'ALIMENTATION ATTENTION: EAU CHAUDE N'enlevez pas la base de bois avant d'@trepr@t5 installer le lave- • Lo conduite peut entrer du c6t# gauche, du c6t# droit, vaisselle. Si vous enlevez la base de bois, le lave-vaisselle pourrait de I'arri@e ou du plancher dans la partie ombr#e indiqu#e basculer Iorsque vous ouvrez la porte.
  • Page 22 Installation du lave-vaisselle ETAPE 1: PREPARATION I_TAPE 3: ENLI_VEMENT DE LA BASE DE BOIS, INSTALLATION DES PIEDS Prenezles pisces fournies dons I'emballage et mettez-les de c6t& • Ensemble de vis DE NIVELLEMENT • Couvercle de la boTtedejonction • Boyau de vidange et collier IMPORTANT Ne frappez pus sur la base...
  • Page 23 Installation du lave-vaisselle I_TAPE 5: INSTALLATION I_TAPE 7: POSITIONNEMENT DE LA DU COUDE DE 90 ° CONDUITE D'EAU ET DE Devant du lave-vaisselle L'ALIMENTATION • Appliquezdu ruban pour joints ELECTRIQUE filet6ssur lesfilets du coude • Positionnezla conduite d'alimentation en eau et le cablage de la de 90°.
  • Page 24 6chTant Figure P no° 8 Si vous souhaitez commander I'ensemble de moulures du Service GE,veuillez composer le 1.800.561.3344 et demander le num@o de pi#ce WD08×10094 pour les modules BB, ou le pport no WD08X10096 pour les modules WW ou CC.
  • Page 25 Installation du lave-vaisselle I_TAPE 12: INSTLLATION DU LAVE-VAISSELLE I_TAPE 13: MISE DE NIVEAU DANS SON EMPLACEMENT LAVE-VAISSELLE DI_FINITIF IM PO RTANT - Le lave-vaisselle doit _tre de niveau • V6rifiez I'isolant de Io cuve, s'il y a lieu, pour vous assurer pour assurer le ban fonctionnement des paniers et de la porte qu'il enveloppe...
  • Page 26 Installation du lave-vaisselle I_TAPE 14: FIXATION DU LAVE-VAISSELLE AU- I_TAPE 15: RACCORDEMENT L'ALIMENTATION EN EAU DESSOUS DU COMPTOIR OU AUX C6TI_S DES ARMOIRES Raccordez la conduite d'alimentation en eau au coude de 90°. • Faitesglisser I'#crou6 compression et ensuite la bague sur Au cours de cette #tape, vous aurez besoin des deux vis 6 t_te I'extr6mit# de la conduite d'alimentation en eau.
  • Page 27 Installation du lave-vaisselle ETAPE 16: RACCORDEMENT DU BOYAU • Branchez le boyau de vidange 6 la coupure anti- refoulement, au raccord en T ou au broyeur 6 d6chets DE VIDANGE 6 I'aidede la m@hode choisie pr6c6demment. Fixez L'extr6mit6 moul6e du boyau de vidange est congue pour s'installer solidement le boyau 6 I'aided'un collier 6 vis sans fin.
  • Page 28 Installation du lave-vaisselle I_TAPE 18: LISTE DE CONTROLE I_TAPE 17: BRANCHEMENT PRI LIMINAIRE L'ALIMENTATION I LECTRIQUE Si un cordon d'elimentetion pourvu d'une fiche est d_j6 Possez en revue cette liste opr_s l'instollotion de votre install_ sur l'appareil, passez 6 l'_tape 18. lave-vaisselle pour _viter des frois de r_paration inutiles non couverts por votre gorontie.
  • Page 29 Installation du lave-vaisselle I TAPE 19: ESSAI DU LAVE-VAISSELLE I TAPEZ0: RI INSTALLATION DU PANNEAU AVEC DE L'EAU INFI RIEUR R6tablissez I'alimentation 61ectrique ou si I'appareil est dot6 • Appuyez le panneau inf6rieur contre les pieds de nivellement du lave-vaisselle. d'un cordon d'alimentation, branchez-le dans la prise de courant murale.
  • Page 30 Notes...
  • Page 31 Notes...
  • Page 32 LES SPECIFICATIONS PEUVENT ETRE MODIFII_ES SANS PREAVIS GEAppliances General Electric Company Louisville, Kentucky/40225 www.electromenagersge.ca © 2012 General Electric Company...

Table of Contents