hit counter script
Download Print this page
IBM PN 10K8798 Installation Instructions Manual
IBM PN 10K8798 Installation Instructions Manual

IBM PN 10K8798 Installation Instructions Manual

Field feature bill of material and network node control point installation

Advertisement

Quick Links

Installation Instructions
Field Feature Bill of Material (FFBM)
Install Network Node Control Point (NNP-B)
3746
PN 42L2445
EC F52322
FFBM
1 of 10
09 Oct 1998
 Copyright IBM Corp. 1998, 2001
Installation of
PN 10K8798
Type 5
(Based on 6578)
Feature Code 5425
on IBM 3746-900
Written by:
C. Vallee
Modified by:
J. Maher
Checked by:
C. Franoux
Approved by:
A. Badino
Reviewed by:
R. Lympany
EC F12701A
EC F70078
14 DEC 1998
22 APR 1999
EC F70110
EC H10024
20 JAN 2000
08 MAR 2001
1

Advertisement

loading

Summary of Contents for IBM PN 10K8798

  • Page 1 Install Network Node Control Point (NNP-B) 3746 PN 42L2445 EC F52322 FFBM 1 of 10 09 Oct 1998  Copyright IBM Corp. 1998, 2001 Installation of PN 10K8798 Type 5 (Based on 6578) Feature Code 5425 on IBM 3746-900 Written by: C.
  • Page 2 Installation Instructions 3746 PN 42L2445 EC F52322 FFBM 2 of 10 09 Oct 1998 EC F12701A EC F70078 EC F70110 14 DEC 1998 22 APR 1999 20 JAN 2000 EC H10024 08 MAR 2001...
  • Page 3 Installation Instructions Before Installation (Steps 1-8) 1.0 Machines Affected 3746 Model 900 with service processor and network node processor type: 6578-RAU, 6563-65U, 6275-56U, 6275-83U, 7585-P02, or 3172-P90. This feature should only be applied on the machine serial number for which it is specified.
  • Page 4: Purpose And Description

    Installation Instructions 2.2 Concurrent ECs (Must be installed together) None. 2.3 Companion ECs (May be installed together) None. 3.0 BMs to Be Installed Feature 10K8798 Network Node Processor B (NNP-B) Feature Code 5425 4.0 Preparation 1. Familiarize yourself with the purpose and details of the installation instruction before negotiating machine time with the customer.
  • Page 5 Installation Instructions 6.2 Description The installation of the NNP-B is divided into two main steps: 1. Installing the 6578-RAU system unit. 2. Loading the code on the NNP-B. Note: These steps are documented in the Network Node Processor Installation and Maintenance (Based on 6578), GY27-0407. 3746 PN 42L2445 EC F52322...
  • Page 6: Installation Time

    Installation (Steps 9-12) 9.0 Safety Review the Safety Notices and the Safety Inspection Procedures located at the beginning of the IBM 3745 Communication Controller All Models, IBM 3746 Expansion Unit Model 900, IBM 3746 Nways Multiprotocol Controller Model 950 Safety Information, GA33-0400.
  • Page 7 Installation Instructions 10.2 Enabling the NNP Back-Up Function Important It's a customer task, but ask the customer if he wants you to perform this task. 1. On the 3746-9X0 main menu, Click on Network Node Processor Man- agement. 2. Double click on Manage Control Point on NNPs. 3.
  • Page 8 Installation Instructions 10.3 Logging Off the MOSS-E 1. On the 3746-9x0 Menu window, click on Function, then click on Exit. 2. On the MOSS-E View window, click on Program. 3. Click on LOG OFF MOSS-E. 4. Close the front and rear doors of the controller expansion. 10.4 Returning the Machine to the Customer Inform the customer that the NNP backup is installed and operational.
  • Page 9 Installation Instructions 15.1 Purchased Machines Refer to the parts ownership matrix to determine the correct owner of removed/unused parts. For EMEA/APG/AG Areas, refer to Hardware and General Service Code Description. For Domestic Areas, return parts to the customer. 16.0 Machine Records Install the new MACHINE HISTORY supplied.
  • Page 10 Installation Instructions 3746 PN 42L2445 EC F52322 FFBM 10 of 10 09 Oct 1998 EC F12701A EC F70078 EC F70110 14 DEC 1998 22 APR 1999 20 JAN 2000 EC H10024 08 MAR 2001...

This manual is also suitable for:

3746-900Ffbm 10k8798Nnp-b type 5