Sign In
Upload
Manuals
Brands
ABB Manuals
Engine
AMI
ABB AMI Manuals
Manuals and User Guides for ABB AMI. We have
1
ABB AMI manual available for free PDF download: Manual
ABB AMI Manual (105 pages)
High Voltage Process Performance Motors
Brand:
ABB
| Category:
Engine
| Size: 2.83 MB
Table of Contents
Table of Contents
10
Chapter 1 Introduction
15
General Information
15
Important Note
15
Limitation of Liability
16
Documentation
16
Documentation of the Machine
16
Information Not Included in Documentation
17
Units Used in this User's Manual
17
Identification of the Machine
17
Serial Number of the Machine
17
Rating Plate
17
Chapter 2 Transport and Unpacking
20
Protective Measures Prior to Transport
20
General
20
Bearing Plate
21
Lifting the Machine
21
Lifting a Machine in a Seaworthy Package
22
Lifting a Machine on a Pallet
23
Lifting an Unpacked Machine
23
Turning a Vertically Mounted Machine
24
Checks Upon Arrival and Unpacking
25
Check Upon Arrival
25
Check Upon Unpacking
25
Storage
25
Short Term Storage (Less than 2 Months)
25
Long Term Storage (more than 2 Months)
26
Rolling Bearings
27
Openings
28
Inspections, Records
28
Chapter 3 Installation and Alignment
29
General
29
Foundation Design
29
Forces to the Foundation
30
Flanges for Vertically Mounted Machines
30
Machine Preparations before Installation
30
Insulation Resistance Measurements
30
Disassembly of the Transport Locking Device
30
Coupling Type
31
Assembly of the Coupling Half
31
Balancing of Coupling
31
Assembly
31
Belt Drive
32
Drain Plugs
32
Installation on Concrete Foundation
32
Scope of Delivery
32
General Preparations
32
Foundation Preparations
33
Foundation and Grouting Hole Preparations
33
Foundation Studs or Sole Plate Preparations
33
Erection of Machines
35
Alignment
35
Grouting
35
Final Installation and Inspection
35
Dowelling of the Machine Feet
35
Covers and Enclosures
36
Installation on Steel Foundation
36
Scope of Delivery
36
Check of Foundation
36
Erection of Machines
36
Alignment
36
Final Installation and Inspection
36
Doweling of the Machine Feet
36
Covers and Enclosures
37
Installation of Flange Mounted Machines on Steel Foundation
37
Alignment
37
General
37
Rough Levelling
38
Rough Adjustment
38
Correction for Thermal Expansion
39
General
39
Thermal Expansion Upwards
40
Thermal Axial Growth
40
Final Alignment
40
General
40
Run-Out of the Coupling Halves
41
Parallel, Angular and Axial Alignment
41
Alignment
42
Permissible Misalignment
43
Care after Installation
44
Chapter 4 Mechanical and Electrical Connections
45
General
45
Electrical Connections
45
General Information
45
Safety
45
Insulation Resistance Measurements
46
Main Terminal Box Options
46
Delivery Without Main Terminal Box
46
Insulation Distances of Main Power Connections
46
Main Power Cables
47
Auxiliary Terminal Box
47
Connection of Auxiliaries and Instruments
48
Connection of External Blower Motor
48
Earth Connections
48
Requirements for Machines Fed by Frequency Converters
49
Main Cable
49
Earthing of Main Cable
49
Auxiliary Cables
49
Chapter 5 Commissioning and Start-Up
50
General
50
Check of Mechanical Installation
50
Insulation Resistance Measurements
50
Check of Electrical Installation
50
Control and Protection Equipment
51
General
51
Stator Winding Temperature
51
Resistance Temperature Detectors
51
Thermistors
52
Bearing Temperature Control
52
General
52
Resistance Temperature Detectors
52
Protection Equipment
52
First Test Start
53
General
53
Precautions before First Test Start
53
Starting
53
Direction of Rotation
53
Running the Machine the First Time
54
Supervision During the First Run
54
Checks During Running of the Machine
54
Bearings
54
Machines with Rolling Bearings
54
Vibrations
55
Temperature Levels
55
Shut down
56
Chapter 6 Operation
57
General
57
Normal Operating Conditions
57
Number of Starts
57
Supervision
58
Bearings
58
Vibrations
58
Temperatures
58
Follow-Up
58
Shut down
59
Chapter 7 Maintenance
60
Preventive Maintenance
60
Safety Precautions
60
Maintenance Program
61
Recommended Maintenance Program
63
General Construction
63
Stator and Rotor
64
Auxiliaries
64
Lubrication System and Bearings
65
Maintenance of General Constructions
65
The Tightness of Fastenings
65
Vibration and Noise
66
Vibrations
67
Measurement Procedures and Operational Conditions
67
Classification According to Support Flexibility
68
Evaluation
68
Maintenance of Bearings and Lubrication System
69
Rolling Bearings
70
Bearing Construction
70
Bearing Plate
70
Re-Greasing Intervals
70
Re-Greasing
71
Bearing Grease
72
Bearing Maintenance
73
Maintenance of Stator and Rotor Windings
73
Particular Safety Instructions for Winding Maintenance
74
The Timing of the Maintenance
74
The Correct Operating Temperature
75
Insulation Resistance Test
75
Conversion of Measured Insulation Resistance Values
75
General Considerations
77
Minimum Values for Insulation Resistance
77
Stator Winding Insulation Resistance Measurement
77
Insulation Resistance Measurement for Auxiliaries
78
The Polarization Index
79
Other Maintenance Operations
79
Repairs, Disassembly and Assembly
79
Chapter 8 - Trouble Shooting
80
Trouble Shooting
80
Mechanical Performance
81
Lubrication System and Bearings
82
Lubrication System and Rolling Bearings
82
Thermal Performance
83
Thermal Performance, Rib Cooled
83
Electrical Performance, Excitation, Control and Protection
83
Protection Trips
83
100 Resistance Temperature Detectors
84
Chapter 9 After Sales Support and Spare Parts
86
After Sales
86
Site Services
86
Spare Parts
86
Support and Warranties
86
Support for Service Centers
86
After Sales Contact Information
86
Spare Parts for Rotating Electrical Machines
87
General Spare Part Considerations
87
Periodical Part Replacements
87
Need of Spare Parts
87
Selection of the most Suitable Spare Part Package
88
Typical Recommended Spare Parts in Different Sets
88
Operational Spare Part Package
88
Recommended Spare Part Package
89
Capital Spare Parts
89
Order Information
89
Chapter 10 Recycling
90
Introduction
90
Average Material Content
90
Recycling of Packaging Material
90
Dismantling of the Machine
91
Separation of Different Materials
91
Frame, Bearing Housing, Covers and Fan
91
Components with Electrical Insulation
91
Permanent Magnets
92
Hazardous Waste
92
Land Fill Waste
92
Commissioning Report
93
Typical Position of Plates
103
Typical Main Power Cable Connections
104
Advertisement
Advertisement
Related Products
ABB AMI Series
ABB AMB Series
ABB AMA Series
ABB AMG Series
ABB AMZ Series
ABB AMA
ABB AMZ
ABB AMXE132
ABB AMXE160
ABB AMXE250
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL