Sign In
Upload
Manuals
Brands
ABB Manuals
Industrial Equipment
PT004116
ABB PT004116 Manuals
Manuals and User Guides for ABB PT004116. We have
1
ABB PT004116 manual available for free PDF download: Operation Manual
ABB PT004116 Operation Manual (106 pages)
Brand:
ABB
| Category:
Industrial Equipment
| Size: 14 MB
Table of Contents
Power2 845-M / High-Pressure Stage
3
Table of Contents
3
Contact Information
6
Introduction
6
Purpose of the Manual
6
Essential Information
7
Power2 Layout and Function
9
Fig. 1: Power2 Layout and Function
9
Layout and Function of the High-Pressure Stage
10
Fig. 2: Layout and Function of the High-Pressure Stage
10
Fig. 3: Power2 HP Diagram
11
Symbols, Definitions
12
Registered Trademarks
13
Table 1: Definition of Pictograms
13
Storage of New Low-Pressure and High-Pressure Stages
14
Fig. 4: Volatile Corrosion Inhibitor (VCI)
14
Fig. 5: Package with Hygrometer
15
Safety
16
Introduction
16
CE Conformity
16
Table 3: Personal Protective Equipment to be Worn Specific to the Respective Task
17
Definition of Safety Instructions
17
Table 2: Personal Protective Equipment to be Worn at All Times
17
Definition of Mandatory Signs
17
Intended Use
18
Deflagration on Gas Engines
19
Warning Plates on the High-Pressure Stage
20
Fig. 6: Locations of Power2 HP Warning Plates
20
Table 5: Recommended Replacement Intervals
21
Table 6: Further Data
21
Table 4: Operating Limits
21
Fig. 7: Rating Plate
21
Rating Plate of the High-Pressure Stage
21
Fig. 8: Location of Power2 HP Rating Plate
22
Periodic Check of the Pressure Vessels
22
Lifting of Loads
23
Fig. 9: Attachment of Loads on the Crane Hook
23
Fig. 10: Attachment Angle
23
Prerequisites for Operation and Maintenance
24
Hazards During Operation and Maintenance
25
Safe Operation
27
Safe Maintenance
28
Table 7: Swivel Lifting Eyes
32
Table 8: Transporting the High-Pressure Stage
32
Fig. 11: Swivel Lifting Eye (Example)
32
Transport / Weight
32
Removal and Installation
32
Removing the High-Pressure Stage
33
Fig. 12: Suspension of Complete High-Pressure Stage
33
Installing the High-Pressure Stage
34
Fig. 13: Suspension of Complete High-Pressure Stage
34
Commissioning
35
Oil Supply
35
Table 9: Pre-Lubrication Time
35
Table 10: Post-Lubrication Time
35
Table 11: Filter Mesh Width
36
Inspection Procedures
37
Commissioning after Taking out of Operation
39
Monitoring During Operation
40
Lubricating Oil Pressure
40
Fig. 14: Lubricating Oil Pressure Measuring Point
40
Table 12: Oil Pressure Range
40
Lubricating Oil Temperature
41
Table 13: Lubricating Oil Temperature
41
Speed Measurement
42
Fig. 15: Functional Principle
42
Fig. 17: Removing the Speed Measurement System
44
Fig. 16: Dimension X
44
Fig. 18: Setting Dimension X
45
Fig. 19: Control Dimension S
46
Operation and Service
47
Noise Emission
47
Service Work
48
Expected Replacement Intervals
50
Table 14: Expected Replacement Intervals [H]
50
Stopping the Engine
51
Periodic Maintenance
52
Foreword to Maintenance
52
Table 15: Maintenance Intervals
52
Cleaning the Compressor During Operation
53
Table 16: Cleaning Parameters Power2 LP
55
Table 17: Cleaning Parameters Power2 HP
55
Cleaning Turbine and Nozzle Ring During Operation
56
Fig. 20: Load/Time Chart
58
Table 18: Operating Point for Turbine Cleaning
58
Table 19: Cleaning Parameters HP
59
Table 20: Cleaning Parameters LP
59
Table 21: Holding Time
59
Table 22: Surface of the Flow Channel
60
Table 25: Malfunctions When Starting - Rubbing of Rotating Parts
61
Table 24: Malfunctions When Starting - Vibrations
61
Table 23: Malfunctions When Starting - Delayed Start-Up
61
Malfunctions When Starting
61
Troubleshooting
61
Malfunctions During Operation
62
Table 26: Malfunctions During Operation - Lubricating Oil Pressure too Low
62
Table 27: Malfunctions During Operation - Power2 LP Speed Reductions
62
Table 28: Malfunctions During Operation - Power2 HP Speed Reductions
62
Table 29: Malfunctions During Operation - Power2 LP Speed Increases
62
Table 30: Malfunctions During Operation - Power2 HP Speed Increases
63
Table 31: Malfunctions During Operation - Exhaust Gas Temperature too High
63
Table 32: Malfunctions During Operation - Charge Air Pressure too Low
64
Table 33: Malfunctions During Operation - Charge Air Pressure too High
64
Table 34: Malfunctions During Operation - Compressor 1 Contamination
65
Table 35: Malfunctions During Operation - Compressor 2 Contamination
65
Surging of the Low-Pressure or High-Pressure Stage
66
Table 36: Surging of the Low-Pressure or High-Pressure Stage
66
Malfunctions When Stopping
67
Speed Measurement System
67
Table 37: Malfunctions When Stopping - Runout Noises
67
Table 38: Malfunctions When Stopping - Runout Time too Short
67
Table 39: Measured Speed Incorrect
67
Disassembly and Assembly
68
Introduction
68
Material Required
69
Weights of Assemblies
70
Table 40: Weights of the Assemblies
70
Fig. 21: Overview of Assemblies
70
Removing the Air Suction Branch Together with Bellows
71
Fig. 22: Removing the Air Suction Branch
71
Removing the Wall Insert
72
Fig. 23: Removing Wall Insert 1
72
Fig. 24: Removing Wall Insert 2
72
Fig. 25: Removing Wall Insert 3
73
Removing the Compressor Casing
74
Fig. 26: Removing the Compressor Casing
74
Fig. 28: Moving out Cartridge Group 2
75
Removing the Cartridge Group
75
Fig. 27: Moving out Cartridge Group 1
75
Fig. 29: Moving out Cartridge Group 3
76
Fig. 30: Moving out Cartridge Group 4
76
Removing the Nozzle Ring
77
Fig. 31: Removing the Nozzle Ring
77
Measuring Axial Clearance a
78
Fig. 32: Measuring Axial Clearance a
78
Table 41: Axial Clearance a
78
Table 42: Tightening Torque (56017)
79
Fig. 33: Installing the Nozzle Ring
79
Installing the Nozzle Ring
79
Installing the Cartridge Group
80
Fig. 34: Installing O-Rings
80
Fig. 35: Installing the Cartridge Group 1
80
Fig. 36: Installing the Cartridge Group 2
81
Table 43: Tightening Torque (42099)
81
Fig. 37: Control Dimension X
82
Table 44: Control Dimension X
82
Table 45: Tightening Torque (61090)
83
Fig. 38: Installing the Compressor Casing
83
Installing the Compressor Casing
83
Installing the Wall Insert
84
Fig. 39: Installing the Wall Insert 1
84
Fig. 40: Installing the Wall Insert 2
85
Table 46: Tightening Torque (72002)
85
Installing the Air Suction Branch Together with Bellows
86
Fig. 41: Installing the Air Suction Branch
86
Table 47: Tightening Torque (72004)
86
Table of Tightening Torques
87
Fig. 42: Tightening Torques
87
Table 48: Tightening Torques
87
Possible Emergency Repairs
88
Taking out of Operation at Short Notice
88
Fig. 43: Cover Plate / Gasket and Sleeves
89
Table 49: Cover Plate / Gasket
89
Fig. 44: Fitting the Cover Plate
90
Fig. 45: Installing the Casing
90
Table 50: Tightening Torque (42099)
90
Taking out of Operation for a Long Period
91
General
91
Lubricating Oil
91
Process for Taking out of Operation
91
REACH and Rohs Compliance Declaration for Products
92
Material and Disposal
92
Disposing of Low-Pressure and High-Pressure Stage Components
93
Spare Parts
94
Ordering Spare Parts
94
Table 51: Customer Spare Part Set (97070)
94
Spare Part - Illustrations
95
Table 52
95
Table 53
96
Table 54
97
Table 55
98
Table 56
99
Figures
104
Advertisement
Advertisement
Related Products
ABB PT004041
ABB PT004024
ABB PT004036
ABB PT004135
ABB PT004087
ABB PT004161
ABB PT004149
ABB PT004162
ABB PT004165
ABB PT004042
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL