Sign In
Upload
Manuals
Brands
Huawei Manuals
Battery Pack
LUNA2000-2.0MWH Series
Huawei LUNA2000-2.0MWH Series Manuals
Manuals and User Guides for Huawei LUNA2000-2.0MWH Series. We have
3
Huawei LUNA2000-2.0MWH Series manuals available for free PDF download: User Manual, Quick Manual
Huawei LUNA2000-2.0MWH Series User Manual (264 pages)
Smart String ESS
Brand:
Huawei
| Category:
Battery Pack
| Size: 11.87 MB
Table of Contents
About this Document
3
Table of Contents
7
Safety Information
11
General Safety
11
Personnel Requirements
14
Electrical Safety
15
Storage and Installation Environment Requirements
17
Loading/Unloading and Transportation Requirements
21
Mechanical Safety
22
Battery Safety
25
Maintenance and Replacement
29
Emergency Handling Plan
29
Overview
31
Model Description
31
Label Description
32
Functions and Features
33
Appearance
34
ESS Composition
37
Battery Cabin
38
Control Unit Cabin
42
Smart Rack Controller Cabin
48
Components
49
Power Supply and Distribution System
49
Battery Pack
49
Smart Rack Controller
51
Embedded Power Subrack
52
Rectifier Module PSU
53
Smu
55
Monitoring System
58
Cmu
59
Smartmodule
61
Input/Output Board (IO Board)
62
Environmental Control System
63
T/H Sensor
64
Air Conditioner in the Control Unit Cabin
65
Air Conditioner in the Battery Cabin
66
Electrode Water Sensor
67
Door Status Sensor
68
Light
69
Fire Suppression System
69
CO Sensor
70
Air Exhaust Module
71
Air Exhaust Controller
71
Extinguishant Control Panel
72
Fire Cylinder
75
Input/Output Modules
76
Fire Signal Transfer Board
78
Heat Detector
79
Smoke Detector
81
Fire Alarm Horn/Strobe
82
Extinguishant Release Indicator
85
Working Principles
86
Battery Circuit Diagram
86
Working Modes
93
Typical Application Scenarios
94
Site Requirements
96
Site Selection Requirements
96
Space Requirements
98
Foundation Requirements
99
Installation
101
Installation Preparations
101
Preparing Tools
101
Installation Environment Check
104
Installing the ESS
104
Determining the Installation Position of the ESS
104
Hoisting the ESS
105
Opening the Doors of the ESS
107
Grounding the ESS
109
Securing the ESS
112
Installing Components
114
Installing Copper Bars between Battery Packs
114
Optional) Filling the Fire Cylinder with Extinguishant
116
Installing the Battery in the Extinguishant Control Panel
119
Installing Cables
122
Preparing Cables
122
Connecting Socket Circuit Wires
123
Installing DC Power Cables
130
Installing AC Input Power Cables (with External Grid Power Supply)
135
Installing Signal Cables
140
Installing FE Communications Cables
141
Installing Optical Cables
143
Sealing the Cable Holes
147
Checking before Power-On
148
Powering on the System
150
Installing the PSU
150
Installing the Solenoid Valve
151
Power-On Process
153
Powering on the Smart Transformer Station (STS)
156
Powering on the Smart Array Controller (SACU)
156
Powering on the Distribution Transformer
157
Powering on the ESS
158
Optional) Powering on the Battery Side of the DC LV Panel
164
Powering on the Smart PCS
164
Smartlogger Web-Based Deployment
167
Preparations and Webui Login
167
Commissioning Using Deployment Wizard
170
Optional) System Setup
178
Check Alarms
179
Powering off the System
181
Delivering a Shutdown Command on the Smartlogger
181
Power-Off Process
182
Powering off the Smart PCS
183
Optional) Powering off the Battery Side of the DC LV Panel
184
Powering off the ESS
184
Powering off the Distribution Transformer
185
Alarm Reference
186
Faq
228
Optional) How to Level the ESS When Doors Cannot be Opened or Closed
228
How to Ensure that the Solenoid Valve Is Not Activated
229
How to Connect the ESS to the Smart PV Management System
230
How to Create a Plant
230
Why Does the PSU Not Start after the Water and Fire Alarms Are Cleared
231
What Should I Do if the ESU Cable Connection Detection Abnormal Alarm Is Generated on the Webui
232
How Do I Perform a Dielectric Voltage Withstand Test on the AC Side of an ESS
232
Technical Data
235
A Operations on the CMU Webui
239
CMU Webui Operations
239
Introduction to Webui
239
Webui Layout
239
Icon Description
240
Webui Menus
241
Maintenance Operations
242
Preparations and Webui Login
243
Upgrading the Software Version
247
Exporting Device Logs
247
Checking Alarms
248
Clearing Alarms
248
B APP Commissioning
249
Downloading and Installing the App
249
Logging in to the App
249
Change Password
252
C Crimping an OT or DT Terminal
253
D Repainting the Equipment
256
E Contact Information
261
F Acronyms and Abbreviations
263
Advertisement
Huawei LUNA2000-2.0MWH Series User Manual (246 pages)
Smart String ESS
Brand:
Huawei
| Category:
Storage
| Size: 10.99 MB
Table of Contents
About this Document
3
Table of Contents
8
1 Safety Information
12
Personal Safety
13
Electrical Safety
15
Environment Requirements
19
Mechanical Safety
21
Equipment Safety
26
ESS Safety
26
Battery Safety
27
2 Overview
34
Model Description
34
Label Description
35
Functions and Features
36
Appearance
37
ESS Composition
45
Battery Cabin
45
Control Unit Cabin
50
Smart Rack Controller Cabin
56
Components
57
Power Supply and Distribution System
57
Battery Pack
58
Smart Rack Controller
59
Embedded Power Subrack
60
Rectifier Module PSU
61
Smu
63
Monitoring System
66
Cmu
67
Smartmodule
69
Input/Output Board (IO Board)
70
Environmental Control System
71
T/H Sensor
72
Air Conditioner in the Control Unit Cabin
73
Air Conditioner in the Battery Cabin
74
Electrode Water Sensor
75
Door Status Sensor
76
Light
77
Fire Suppression System
77
CO Sensor
78
Air Exhaust Module
79
Air Exhaust Controller
79
Extinguishant Control Panel
80
Fire Cylinder
83
Input/Output Modules
85
Fire Signal Transfer Board
87
Heat Detector
88
Smoke Detector
90
Fire Alarm Horn/Strobe
92
Extinguishant Release Indicator
94
Optional) Water Sprinkler System
96
Working Principles
98
Battery Circuit Diagram
98
Working Modes
105
Typical Application Scenarios
106
3 Transportation and Storage
107
Transportation Requirements
107
Storage Requirements
110
Charging Requirements for a Single Battery
114
4 Site Requirements
118
Site Selection Requirements
118
Clearance Requirements
121
Foundation Requirements
121
5 Installation
123
Installation Preparations
123
Preparing Tools
123
Installation Environment Check
126
Unpacking and Acceptance
126
Installing the ESS
126
Determining the Installation Position of the ESS
126
Hoisting the ESS
127
Opening the Doors of the ESS
130
Grounding the ESS
132
Securing the ESS
134
Installing Components
136
Installing Copper Bars between Battery Packs
136
Optional) Filling the Fire Cylinder with Extinguishant
141
Installing the Battery in the Extinguishant Control Panel
144
6 Installing Cables
148
Preparing Cables
148
Connecting Socket Circuit Wires
151
Installing DC Power Cables
158
Installing AC Input Power Cables (with External Grid Power Supply)
163
Optional) Connecting Single-Phase AC Input Power Cables
168
Installing Signal Cables
170
Installing FE Communications Cables
170
Installing Optical Cables
173
Sealing the Cable Holes
177
7 Checking before Power-On
178
8 Powering on the System
180
Installing the PSU
180
Installing the Solenoid Valve
182
Power-On Process
185
Powering on the Smart Transformer Station (STS)
188
Powering on the Smart Array Controller (SACU)
188
Powering on the Distribution Transformer
188
Powering on the ESS
189
Optional) Powering on the Battery Side of the DC LV Panel
195
Powering on the Smart PCS
196
9 Deployment and Commissioning (Smartlogger Webui)
198
10 Powering off the System
199
Delivering a Shutdown Command on the Smartlogger
199
Power-Off Process
200
Powering off the Smart PCS
201
Optional) Powering off the Battery Side of the DC LV Panel
202
Powering off the ESS
202
Powering off the Distribution Transformer
204
11 Alarm Reference
205
12 Emergency Handling
206
13 Faq
208
Optional) How to Level the ESS When Doors Cannot be Opened or Closed
208
How to Ensure that the Solenoid Valve Is Not Activated
209
How to Connect the ESS to the Smart PV Management System
210
How to Create a Plant
210
Why Does the PSU Not Start after the Water and Fire Alarms Are Cleared
211
What Should I Do if the ESU Cable Connection Detection Abnormal Alarm Is Generated on the Webui
212
How Do I Perform a Dielectric Voltage Withstand Test on the AC Side of an ESS
212
14 Technical Specifications
215
A Operations on the CMU Webui
219
CMU Webui Operations
219
Webui Layout
219
Icon Description
220
Webui Menus
221
Maintenance Operations
222
Preparations and Webui Login
222
Upgrading the Software Version
227
Exporting Device Logs
227
Checking Alarms
228
Clearing Alarms
228
B APP Commissioning
229
Downloading and Installing the App
229
Logging in to the App
229
Change Password
231
C Crimping an OT or DT Terminal
233
D How Do I Repair Paint Damage
236
E Certificate Management and Maintenance
241
F Contact Information
243
G Acronyms and Abbreviations
245
Huawei LUNA2000-2.0MWH Series Quick Manual (49 pages)
Smart String ESS
Brand:
Huawei
| Category:
Storage
| Size: 6.64 MB
Table of Contents
Installing Components
6
Installing Cables
15
Preparing Cables
15
Checking before Power-On
30
Powering on the System
31
Installing the PSU
31
Installing the Solenoid Valve
31
Power-On Process
34
Checking Alarms
43
Advertisement
Advertisement
Related Products
Huawei LUNA2000-2.0MWH-1H1
Huawei LUNA2000-2.0MWH-2H1
Huawei LUNA2000-21-S1
Huawei Smart String ESS LUNA2000-215-2S10
Huawei Smart String ESS LUNA2000-215-2S12
Huawei LUNA2000 Series
Huawei LUNA2000-10KW
Huawei LUNA2000-S0 Series
Huawei LUNA2000-20-S0
Huawei LUNA2000-200KWH-2H1 Smart String ESS
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Inverter
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL