Sign In
Upload
Manuals
Brands
Motorola Manuals
Transceiver
SC 300
Motorola SC 300 Manuals
Manuals and User Guides for Motorola SC 300. We have
2
Motorola SC 300 manuals available for free PDF download: Manual, Installation Manual
Motorola SC 300 Manual (188 pages)
BTS Hardware Installation, ATP and FRU Procedure
Brand:
Motorola
| Category:
Transceiver
| Size: 3.26 MB
Table of Contents
Table of Contents
3
List of Figures
7
Foreword
19
General Safety
22
Revision History
24
SC 300 BTS Hardware Installation, ATP and FRU Procedures
24
Software Release 2.15.X.X
24
Patent Notification
25
Introduction
29
Figure 1-1: Microcell Unit Mounted on a Wall
32
Figure 1-2: Primary Surge Suppressor Mounted on a Wall
33
Figure 1-3: Microcell Unit Mounted on a Rack
34
Figure 1-4: Primary Surge Suppressor Mounted on a Rack
35
Figure 1-5: Microcell Unit Mounted on a Pole
36
Figure 1-6: Primary Surge Suppressor Mounted on a Pole
37
Figure 1-7: Picocell Unit Mounted on a Ceiling
38
Required Documents
39
Installation Tools and Materials
41
Table 1-1: Tools and Materials for Pole Mounting
41
Table 1-2: Tools and Materials for Rack Mounting
41
Table 1-3: Mounting Bracket Tools and Materials for Concrete Wall Mounting
42
Table 1-4: Tools and Materials for Concrete Ceiling
43
ATP Tools and Materials
44
Figure 1-8: RS232-IEEE488 Converter Serial Cable Configuration
46
FRU Tools and Materials
49
Table 1-5: Tools Required to Perform FRU Procedures
49
Unit Identification
50
Figure 1-9: General Block Diagram Showing the Port Names
50
Figure 1-10: General Block Diagram Showing the Unit, Site I/O Interface, and External Items
51
Figure 1-11: Microcell and Picocell Unit
52
Figure 1-12: Site I/O Junction Box and Cable
52
Figure 1-13: Primary Surge Suppressor (Optional)
53
Figure 1-14: AC Installation Box (Optional)
53
Figure 1-15: Mounting Bracket for both Microcell and Primary Surge Suppressor
54
Figure 1-16: Mounting Bracket for Picocell
54
Figure 1-17: Adapters for Rack Mounting
55
Figure 1-18: Adapters for Pole Mounting
56
Figure 1-19: Adapter for Ceiling Mounting (Optional)
57
Figure 1-20: Installation Handles for Lifting Unit (Optional)
57
Figure 1-21: Short Duration Battery (Optional)
57
Figure 1-22: Front and Back Solar Covers for Microcell
58
Figure 1-23: Front and Back Solar Covers for Surge Suppressor
58
Figure 1-24: Front and Back Fin Covers for Microcell and Picocell (Picocell Shown)
59
Installation and ATP Order
61
Chapter 2: Site Preparation
63
Site Preparation Overview
65
Overview
65
External Installation Versus Internal Installation
65
Verifications and Procedures
65
Site Manager
65
Verifications and Inspections
65
Site Inspections
66
Inspection Overview
66
Deficiencies
66
What to Inspect
66
Antenna and Tower Inspections
66
Structural Inspections and Verifications
67
Environmental Inspections (Indoor Only)
69
Grounding Inspections
69
Prepare Site for the Arrival of the Equipment
70
Figure 2-1: Securing Lights with Tape
70
Description
70
Equipment Arrival
70
Securing Fluorescent Lights
70
Table 2-1: Procedure to Prepare the Site for the BTS
71
Procedure to Prepare the Site for the Equipment
71
Dimensions and Clearances
72
Table 2-2: Installation Dimensions for the Microcell and Picocell Units
72
Table 2-3 Minimum Clearances Microcell and Picocell Units
73
Table 2-4 Minimum Clearances for Surge Suppressor
73
Dimensions and Clearances
73
Figure 2-2: Overall Dimensions of Microcell and Picocell Units
74
Dimensions and Clearances
74
Unit Dimensions
74
Figure 2-3: Overall Dimensions of Primary Surge Suppressor
75
Unit Clearances
76
Figure 2-9: Installation and Functional Clearances for
81
Figure 2-10: Concept of Functionality Clearances for Microcell and Picocell Units
82
Chapter 3: Installing Mounting Bracket and Remote GPS
83
Overview
85
Procedure Order
85
Unpacking the Equipment and Inspecting for Damage
86
Objective
86
How System Is Packed
86
Inspecting for Damage
86
Attaching the Mounting Bracket to a Wall
88
Figure 3-1: Holes to Use to Mount the Bracket to the Wall
88
Objective
88
Mounting Bracket Hole Locations
88
Table 3-1: Mounting Bracket Tools and Materials for Concrete Wall Mounting
89
Required Tools and Materials for Concrete Wall Mounting
89
Table 3-2: Procedure to Drill Holes in the Wall for Mounting Bracket Installation
90
Procedure to Drill Holes in the Wall
90
Table 3-3: Procedure to Secure the Mounting Bracket to a Wall
91
Securing Mounting Bracket to a Wall
91
Figure 3-2: Securing Mounting Bracket to a Wall
92
Attaching the Mounting Bracket to a Ceiling
93
Objective
93
Mounting Bracket Hole Locations
93
Figure 3-3: Picocell Ceiling Mounting Bracket
94
Table 3-4: Tools and Materials for Concrete Ceiling
94
Tools and Materials for Installing the Mounting Bracket on a Ceiling
94
Figure 3-4: Securing Mounting Bracket to the Adapter
95
Table 3-5: Procedure to Secure the Mounting Bracket to the Adapter
95
Securing Mounting Bracket to Adapter
95
Attaching the Mounting Bracket to a Pole
96
Table 3-6: Tools and Materials for Pole Mounting
96
Objective
96
Required Tools and Materials for Pole Mounting
96
Table 3-7: Procedure for Attaching the Mounting Bracket to a Pole
97
Procedure to Attach the Mounting Bracket to a Pole
97
Figure 3-5: Pole Adapter and Straps
98
Figure 3-6: Attaching Mounting Bracket to a Pole
99
Attaching the Mounting Bracket to a Rack
100
Table 3-8: Tools and Materials for Rack Mounting
100
Table 3-9: Procedure to Attach the Mounting Bracket to a Rack
100
Objective
100
Tools and Materials for Installing the Mounting Bracket on a Rack
100
Procedure to Attach the Mounting Bracket to a Rack
100
Figure 3-7: Attaching the Mounting Bracket to a Rack
102
Attaching Back Solar Cover to Mounting Bracket
103
Table 3-10: Procedure to Attach Back Solar Cover to Mounting Bracket
103
Objective
103
When to Use the Cover
103
Required Tools
103
Procedure
103
Figure 3-8: Attaching Microcell Back Solar Cover to Mounting Bracket
104
Remote GPS Head Installation
105
Table 3-11: Installing the RGPS Head
105
Objective
105
Tools and Materials
105
Installation Procedure
105
Figure 3-9: Installing the Remote GPS Head
106
Table 4-29: Cable Descriptions and Part Numbers
107
Cabling Overview
109
Overview
109
Configurations Supported
109
Cabling Installation Order
109
Cable Labels
109
Cable Descriptions
110
Table 4-1: Cable Descriptions and Part Numbers
110
Table 4-2: Microcell Expansion Kit for Units 1 to
112
Table 4-3: Microcell Expansion Kit for Units 1 to
112
Table 4-4: Picocell Expansion Kit for Units 1 to 2 Short MIB a (Cubicle) - T448AN
112
Table 4-5: Picocell Expansion Kit for Units 1 to
112
Motorola Kits for Multi-Unit Installations
112
Table 4-6: Microcell/Picocell Expansion Kit for Units 2 to 3 Current 2M MIB B - T448AR
113
Table 4-7: Microcell/Picocell Expansion Kit for Units 2 to 3 Long 5M MIB B - T448AS
113
Table 4-8: Microcell/Picocell Expansion Kit for Units 3 to 4 Current 2M Mibs B and C - T448AT
113
Table 4-9: Microcell/Picocell Expansion Kit for Units 3 to 4 Longer 5M Mibs B and C - T448AU
114
Table 4-10: Picocell Expansion Kit for Units 3 to 4 Current 2M Mibs B and C - T448AV
114
Table 4-11: Picocell Expansion Kit for Units 3 to 4 Longer 5M Mibs B and C - T448AW
114
Table 4-12: RGPS Synchronization Cable Kit - SGKN4351A
115
Table 4-13: RGPS Synchronization Cable Kit - SGKN4352A
115
Motorola Kits for RGPS Cabling
115
Site Cabling for BTS with Customer-Supplied Site I/O Interface
116
Figure 4-1: Site Cabling for One Microcell
116
Preparing Site Cabling Scope of Work
116
Figure 4-2: Site Cabling for Two Microcells
117
Figure 4-3: Site Cabling for Three Microcells
118
Figure 4-4: Site Cabling for Four Microcells
119
Figure 4-5: Site Cabling for One Picocell
120
Figure 4-6: Site Cabling for Two Picocells
121
Figure 4-7: Site Cabling for Three Picocells
122
Figure 4-8: Site Cabling for Four Picocells
123
Power, Ground, and Battery Cabling for Sites Equipped with Customer-Supplied Site I/O Interface
124
Objective
124
Other Grounding Considerations
124
Power Requirements and Configurations
124
Figure 4-9: AC Input Cable Connector Information
125
Table 4-14: Cables Needed for Power, Earth Ground, and Battery Connections
125
Table 4-15: AC Input Cable Information
125
Cables Needed
125
AC Input Cable Information
125
Figure 4-10: DC Input Cable Connector Information
126
Table 4-16: DC Input Cable Information
126
Table 4-17: Procedure to Install Earth Ground Cable
126
DC Input Cable Information
126
Table 4-18: Procedure to Install AC Input Cable(S) (Indoor Applications)
127
Table 4-19: Procedure to Install AC Installation Box
127
Table 4-20: AC Installation Box Cabling
127
Figure 4-11: AC Installation Box
128
Table 4-21: Procedure to Install DC Input Cable(S)
128
Antenna Cabling for Sites Equipped with Customer-Supplied Site I/O Interface
129
Objective
129
Cable Labels
129
Equipment Needed
129
Antenna Cable Pin and Signal Information
129
Procedure to Install Antenna Cabling for One Antenna
130
Procedure to Install Antenna Cabling for Multi-Unit Configurations
130
Figure 4-15: Antenna Cabling for Maximum of Four Microcells or Picocells
131
Site I/O , Span Line, RGPS and Modem Cabling for Sites Equipped with Customer-Supplied Site I/O Interface
132
Table 4-24: Cables Needed for Antenna Connections
132
Objective
132
Cable Labels
132
Tools and Equipment
132
Site I/O Cabling
132
Procedure to Install Site I/O Cable between Site I/O Junction Box and Site I/O Interface
133
Pin and Signal Information for Site I/O Cabling
134
Connecting Customer-Defined Inputs to the Site I/O Interface
136
Connecting the RGPS Cable to the Site I/O Interface
137
Connecting the Span Line Cable to the Site I/O Interface
137
Connecting a Phone Line to the Site I/O Interface (Modem Support)
138
RGPS Cabling for Multi-BTS Configurations
139
Overview
139
Background
139
Required Equipment
139
Cable Diagram
140
Procedure
140
Figure 4-17: Site I/O Interface Cabling for RGPS (Synchronous) Configurations
141
Figure 4-18: Site I/O Interface Cabling for HSO (Non-Synchronous) Configurations
142
Cable Connections
143
Span Line Daisy Chain Cabling
144
Objective
144
Background
144
Cable Description
144
Procedure
144
Figure 4-18: Site I/O Interface Cabling for Span Line Daisy Chain Cabling
145
Table 4-32: Cable Run List for Span Line Daisy Chain Cabling
146
Cable Connections
146
Chapter 5: Preparing Site Cabling for Sites Equipped with
147
Cabling Overview
149
Overview
149
Configurations Supported
149
Cabling Installation Order
149
Cable Labels
149
Site Cabling for BTS with Optional Primary Surge Suppressor
150
Figure 5-1: Site Cabling for One Microcell with Primary Surge Suppressor
150
Preparing Site Cabling Scope of Work
150
Figure 5-2: Site Cabling for Two Microcells with Primary Surge Suppressor
151
Figure 5-3: Site Cabling for Three Microcells with Primary Surge Suppressor
152
Figure 5-4: Site Cabling for Four Microcells with Primary Surge Suppressor
153
Figure 5-5: Site Cabling for One Picocell with Primary Surge Suppressor
154
Figure 5-6: Site Cabling for Two Picocells with Primary Surge Suppressor
155
Figure 5-7: Site Cabling for Three Picocells with Primary Surge Suppressor
156
Figure 5-8: Site Cabling for Four Picocells with Primary Surge Suppressor
157
Attaching Surge Suppressor to Mounting Bracket
158
Table 5-1: Procedure to Attach the Surge Suppressor to the Mounting Bracket
158
Objective
158
Background
158
Tools
158
Procedure to Attach the Surge Suppressor to the Mounting Bracket
158
Figure 5-9: Attaching the Surge Suppressor to the Mounting Bracket
159
Power, Ground and Battery Cabling for Sites Equipped with Optional Primary Surge Suppressor
160
Objective
160
Other Grounding Considerations
160
Power Considerations and Configurations
160
Figure 5-10: AC Input Cable Connector Information
161
Table 5-2: Cables Needed for Power, Earth Ground, and Battery Connections
161
Table 5-3: AC Input Cable Information
161
Cables Needed
161
AC Input Cable Information
161
Figure 5-11: DC Input Cable Connector Information
162
Table 5-4: DC Input Cable Information
162
Table 5-5: Procedure to Install the Master Ground Cable on a
162
DC Input Cable Information
162
Table 5-6: Procedure to Install Earth Ground Cable on a BTS Equipped with Optional Primary Surge Suppressor
163
Figure 5-12: Primary Surge Suppressor AC Input Power Connection Locations
164
Antenna Cabling for Sites Equipped with Optional Primary Surge Suppressor
166
Objective
166
Cable Labels
166
Equipment Needed
166
Antenna Cable Pin and Signal Information
166
Figure 5-16: Antenna Cabling for Two Microcells with Primary Surge Suppressor
168
Figure 5-17: Antenna Cabling for Three Microcells with Primary Surge Suppressor
168
Figure 5-18: Antenna Cabling for Four Microcells with Primary Surge Suppressor
169
Figure 5-19: Antenna Cabling for One Picocell with Primary Surge Suppressor
169
Figure 5-20: Antenna Cabling for Two Picocells with Primary Surge Suppressor
170
Figure 5-21: Antenna Cabling for Three Picocells with Primary Surge Suppressor
170
Figure 5-22: Antenna Cabling for Four Picocells with Primary Surge Suppressor
171
Site I/O, Span Line, RGPS and Modem Cabling for Sites Equipped with Primary Surge Suppressor
172
Objective
172
Cable Labels
172
Tools and Equipment
172
Site I/O Cabling
172
Figure 5-22: Site I/O Cabling Details with
173
Procedure to Install Site I/O Cable between Site I/O Junction Box and Optional Primary Surge Suppressor
173
Figure 5-23: Punchdown Block Location
174
Figure 5-24: Punchdown Block
174
Pin and Signal Information for Surge Suppressor Punchdown Block Cabling
175
Connecting Customer-Defined Inputs to the Primary Surge Suppressor
178
Connecting the RGPS Cable to the Primary Surge Suppressor
178
Connecting the Span Line Cable to the Primary Surge Suppressor
179
Connecting a Phone Line to the Primary Surge Suppressor (Modem Support)
179
RGPS Cabling for Multi-BTS Configurations Equipped with Optional Primary Surge Suppressor
180
Overview
180
Background
180
Required Equipment
180
Cable Diagram
181
Procedure
181
Figure 5-26: Site I/O Interface Cabling for RGPS (Synchronous) Configurations
182
Figure 5-27: Site I/O Interface Cabling for HSO (Non-Synchronous) Configurations
183
Cable Connections
184
Span Line Daisy Chain Cabling for Sites Equipped with Optional Primary Surge Suppressor
185
Objective
185
Background
185
Cable Description
185
Procedure
185
Figure 5-27: Site I/O Interface Cabling for Span Line Daisy Chain Cabling
186
Cable Connections
187
Advertisement
Motorola SC 300 Installation Manual (96 pages)
1X BTS Hardware Installation, ATP, and FRU Procedures
Brand:
Motorola
| Category:
Transceiver
| Size: 1.47 MB
Table of Contents
Table of Contents
5
Table of Contents
3
Table of Contents
5
Sct300 1X BTS Hardware Installation, ATP, and FRU Procedures
7
Software Release 2.16.0.X (1.9 Ghz)
7
General Safety
21
FCC Requirements
23
Revision History
26
Patent Notification
27
Chapter 1: Introduction
29
Introduction
31
Scope of this Document
31
Manual Order
31
Site Cleanliness
32
Site Manager
32
System Diagrams
32
Configurations
33
Required Documents
40
Installation Tools and Materials
41
Introduction
41
Required Tools and Materials for Installing the Mounting Bracket on a Pole
41
Installation Tools and Materials
42
Required Tools and Materials for Installing the Mounting Bracket on a Rack
42
Required Tools and Materials for Installing the Mounting Bracket on a Concrete Wall
42
ATP Tools and Materials
43
Policy
43
Test Equipment Calibration
43
Test Cable Calibration
43
Equipment Warm-Up
43
ATP Tools and Materials
44
Test Equipment List
44
Optional Equipment
46
FRU Tools and Materials
48
Introduction
48
List of Frus
48
Required Tools and Materials to Perform FRU Procedures
48
Unit Identification
49
Overview
49
Installation and ATP Order
57
Installation Order
57
ATP Order
57
Chapter 2: Site Preparation
59
Site Preparation Overview
59
Site Preparation Overview
61
Overview
61
External Installation Versus Internal Installation
61
Verifications and Procedures
61
Site Manager
61
Verifications and Inspections
61
Site Inspections
62
Inspection Overview
62
Deficiencies
62
What to Inspect
62
Antenna and Tower Inspections
62
Site Inspections
63
Structural Inspections and Verifications
63
Environmental Inspections (Indoor Only)
65
Grounding Inspections
65
Prepare Site for the Arrival of the Equipment
66
Description
66
Equipment Arrival
66
Securing Fluorescent Lights
66
Prepare Site for the Arrival of the Equipment
67
Procedure to Prepare the Site for the Equipment
67
Dimensions and Clearances
68
Overview
68
Dimensions and Clearances
69
Dimensions and Clearances
70
Unit Dimensions
70
Unit Clearances
71
Chapter 3: Installing Mounting Bracket and Remote Gps
75
Attaching Back Solar Cover to Mounting Bracket
75
Mounting Bracket Installation Overview
75
Mounting Bracket Installation Overview
77
Overview
77
Procedure Order
77
Unpacking the Equipment and Inspecting for Damage
78
Objective
78
How System Is Packed
78
Inspecting for Damage
78
Unpacking the Equipment and Inspecting for Damage
79
Attaching the Mounting Bracket to a Wall
80
Objective
80
Required Tools and Materials
80
Attaching the Mounting Bracket to a Wall
81
Procedure to Drill Holes in the Wall
81
Procedure to Secure the Mounting Bracket to a Wall
82
Mounting Bracket Hole Locations
83
Attaching the Mounting Bracket to a Pole
85
Objective
85
Required Tools and Materials
85
Attaching the Mounting Bracket to a Pole
86
Procedure to Attach the Mounting Bracket to a Pole
86
Attaching the Mounting Bracket to a Rack
89
Objective
89
Required Tools and Materials
89
Procedure to Attach the Mounting Bracket to a Rack
89
Attaching the Mounting Bracket to a Rack
90
Attaching Back Solar Cover to Mounting Bracket
91
Objective
91
When to Use the Cover
91
Required Tools and Materials
91
Procedure
91
Remote GPS Head Installation
92
Objective
92
Required Tools and Materials
92
RGPS Mounting Considerations
92
Remote GPS Head Installation
93
Procedure to Install the RGPS Head
93
Advertisement
Related Products
MOTOROLA SC-3160
Motorola MicroTAC SC-725
Motorola SCOUT600
Motorola SCOUT1000
Motorola SCOUT2500
Motorola SCOUT2300
Motorola SCOUT2300/2
Motorola SCOUT2300/3
Motorola SCOUT2300/4
Motorola SCOUT500
Motorola Categories
Cell Phone
Two-Way Radio
Baby Monitor
Cordless Telephone
Radio
More Motorola Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL