2 Unit Installation
2.2 Transportation of outdoor unit
D A N G E R
Do not put any foreign material into the outdoor unit and check to ensure that none exists in the outdoor unit
before the installation and test run. Otherwise a fire or failure will occur.
C A U T I O N
Transport the products as close to the installation location as practical before unpacking.
Hanging Method
When hanging the unit ensure the balance of the unit check safety and lift it up smoothly. Do not remove any packing ma-
terials and hang the unit under packing condition with two ropes as shown below.
RAS-(2-3)HVNP1(E)
RAS-3HVNC1
RAS-(4-6)H(V)NC1E
1
1. Wire rope.
A. Over 60º.
B. 0.7 to 1.0 m.
C. Do not remove the plastic band or the corrugate paper frame.
D. Pass the wire ropes through each lifting hole in the wooden base as shown.
C A U T I O N
• Lift the outdoor unit in its factory packaging with 2 wire ropes.
• For safety reasons ensure that the outdoor unit is lifted smoothly and does not lean.
• Do not attach lifting equipment to the plastic band or the corrugated paper frame because of the ropes will slip or break
the materials.
• Ensure that the exterior of the unit is adequately protected with cloth or paper.
Gross weight
Premium series
Model
RAS-(2-2.5)HVNP1
RAS-3HVNP1E
RAS-(4-6)H(V)NP1E
RAS-8HNPE
RAS-10HNPE
RAS-12HNP
17
SMGB0087 rev.0 - 12/2013
A
B
C
D
Weight (kg)
46
77
116
149
151
179
RAS-(4-6)H(V)NP1E
RAS-(8-10)HN(P/C)E
RAS-12HN(P/C)
A
1
Standard series
Model
Weight (kg)
RAS-3HVNC1
RAS-4H(V)NC1E
RAS-(5-6)H(V)NC1E
RAS-8HNCE
149
RAS-10HNCE
151
RAS-12HNC
179
2
B
C
D
49
85
95