http://tsn.pstc.panasonic.com/viewing/NA/PT-53X54J/SVC/s1301000000.html
Some tie-wraps that secure the wire dressings may need to be unfastened for chassis removal.
DC-Board
1. Plugs onto the D-Board at the D21, D22 and D23 (DC1, DC2 and DC3 respectively) connectors.
NOTE:
This board is non-serviceable.
When removing this board pull carefully.
R-Board
1. This board is secured to the upper front side of the light box by one screw, and plugged to R1 connector from A7 on A-Board.
LR, LG and LB Board
1. Each board is plugged into the socket on the PRT neck, LR-Board on red PRT, LG-Board on green PRT and LB-Board on
blue PRT.
TOP PREVIOUS NEXT
http://tsn.pstc.panasonic.com/viewing/NA/PT-53X54J/SVC/s1301000000.html (2 of 2) [23/04/2012 12:16:15 p.m.]