Electric installation - electric, gas, steam heated
To be carried out by qualified personnel
The tumble dryer must be connected to its own
fuse group and pulti-pole main switch according
to IEC 6094.
Connecting the cable
Demount the cover plate from the supply unit.
The cable is led through the cable gland to the
terminal block and connected as illustrated. If
there is a neutral conductor in the power supply
line this must be connected to terminal N:
Fig. 1 Gas and steam heated 1-phase
Fig. 2 Gas and steam heated 1-phase
with supply disconnector
Fig. Gas and steam heated -phase
To be continued on the following page
Installation
1
2