hit counter script

The Cable-Management Arm, Support Rails, And; Cable-Management Arm And Associated Parts - IBM SAN Volume Controller 2145-CG8 Hardware Maintenance Manual

System storage san volume controller series
Hide thumbs Also See for SAN Volume Controller 2145-CG8:
Table of Contents

Advertisement

Cable management arm kit
6
5
Figure 9. The cable-management arm, support rails, and associated parts of the 2145-CG8 and 2145-CF8
Table 23. Cable-management arm and associated parts descriptions and quantities
Reference
Description
1
Slide rail (left)
2
Slide rail (right)
3
M6 screws
4
Large cable tie
5
Cable ties
6
Cable-management support arm
7
Cable-management arm assembly
To remove the cable-management arm, perform the following steps:
1. Remove all power from the node, as described in MAP 5350 in the IBM System Storage SAN Volume
Controller Troubleshooting Guide.
2. Disconnect all cables from the back of the node.
3. Slide the node away from the back of the rack.
a. Remove any optional M6 screws, as shown by 1 in Figure 10 on page 28, from the front of the
node.
b. To release the node from the rack, press the orange release latches 2 and slide the node forward
until it latches in the service position.
7
4
Friction rail kit
Chapter 2. Removing and replacing parts
1
2
3
Quantity
1
1
4
1
5
1
1
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents