hit counter script
Download Print this page

Advertisement

Quick Links

www.taigaconcept.com
ASSEMBLY
GUIDE
LOHKO BOX 5
x2
4h

Advertisement

loading

Summary of Contents for Taiga Concept LOHKO BOX 5

  • Page 1 ASSEMBLY GUIDE LOHKO BOX 5...
  • Page 2: Installation

    Product may have some smell after assembling but it has high humidity. will disappear in few weeks. It is recommended to use Taiga Concept local dealers Place the product so that the minimum space between authorized assembling person. Before installation nd out your country re regulation roof element and ceiling needs to be at least 10 cm.
  • Page 3 If you find damage, document with photos according instructions Check if there is any damage Remove top cover and check that Carry the elements Assemble the product to the package there are no signs of damage before Note: Take extra care unpacking.
  • Page 4 1. Take images where you can see 2. Take closer images of the damage 3. Contact your local Taiga dealer full package from 2 di erent angles which show the damage 1. Take images where you can see 3. Contact your local Taiga dealer 2.
  • Page 5: Elements & Components

    Elements & Components 1x CD004 1x CR007 1x CF007 1x CD005 1x CR004 1x CF006 2x CD006 1x CR006 4x SR006 1x CF004 1x CG003 2x SR007 1x CW015 2x CG004 1x CW011 1x EP106 3x CG005 1x CW012 200cm 500cm 1x EC1xx 1x EC221...
  • Page 6 Elements & Equipments Components & tools Roof 8x SC006 4x SR001 4x SS002 Gloves Safety glasses Safety shoes Safety helmet Doorframe & Roof acoustic panel 4x SS003 18x SC001 24x SC002 2x SS004 Wall connector Hinges Screw machine + bits Hex key set Spirit leveler Small adjustable...
  • Page 7 ATTENTION Never put glass against hard surface, use always carton or carpet under the glass. Use always 2 person and suction cups to lift glass...
  • Page 8 SR003 CF007 CF006 CF004...
  • Page 9 SC006...
  • Page 10 CW015...
  • Page 11 SS002 CG005...
  • Page 12 CW014...
  • Page 13 SS002 CG005...
  • Page 14 SR006 SR006...
  • Page 15 SF006 CW013 CW013 SC003...
  • Page 16 SR006 SR006...
  • Page 17 CW011 CW012...
  • Page 18 SR003 Warning: Do not apply excessive force...
  • Page 19 CR007 SR007 EC220 EC221...
  • Page 20 SR001 SR007...
  • Page 21 SC001...
  • Page 22 SS005...
  • Page 23 CG005...
  • Page 25 CR004...
  • Page 26 5 mm 5 mm 5 mm 5 mm...
  • Page 27 EC220 EC221 EP109 EC221 EC220 EC1xx...
  • Page 28 SS004...
  • Page 29 CG004 CG004...
  • Page 30 SC002 CD006...
  • Page 31 CD006...
  • Page 32 SC002...
  • Page 33 HINGE SIDE CONTROL PANEL SIDE...
  • Page 34 CD005...
  • Page 35 EP106...
  • Page 36 CD005...
  • Page 37 91 cm...
  • Page 38 SR001 SCA005...
  • Page 39 SH00x CG003 Clean the glass before assembling the hinges.
  • Page 40 BOTTOM BOTTOM Torque = 20 Nm Never use drilling machine to tighten hinge screws...
  • Page 42 SC005 > 130 ° Make sure that door glass will not touch hinge support parts while and after assembling the door...
  • Page 43 SC005 > 130 °...
  • Page 44 SF003 SF001 Turn on the ventilation, check each side and corner of the door by hand that there is no air leaks...
  • Page 45 SM001 To increase magnetic strength add small magnets to metallic strip (no screws required)
  • Page 46 SC002...
  • Page 47 CA2xx CA2xx CA2xx CA2xx...
  • Page 48 Option 1: Powercord assembled from oor level Option 2: Powercord assembled from roof level...
  • Page 49 ll the holes with rubber seal SR006 Turn on the ventilation, check each side and corner of the door by hand that there is no air leaks Check if there is any air leak between frames and elements/glasses. Check that door glass touches the seals when door is closed...
  • Page 50 www.taigaconcept. Assembly support +358 401 384 02...