Operation Manual TPL65-A10 Type TPL65-A10 HT846663 Mmax Mmax °C Bmax Bmax 01230 Application according to Year 2021 the Operation Manual ABB Turbocharging...
Page 2
In case the operation conditions differs signifi cantly from what is considered to be normal for the cur- rent application, it is recommended to contact ABB for a re-calculation of replacement intervals. Frequent load alterations, high temperatures and high speed lower the life of components.
Operation Manual / TPL65-A10 / -A30 Table of contents Operation Manual Preliminary remarks....................3 Purpose of this manual ....................3 Layout and function......................4 Intended use of the turbocharger ................6 Storage of new turbochargers and spare parts ............7 Essential information.....................
Page 4
Operation Manual / TPL65-A10 / -A30 Table of contents Troubleshooting....................70 Malfunctions when starting..................70 Surging of the turbocharger..................71 Malfunctions during operation .................. 72 Malfunctions when stopping ..................75 Speed measurement system ..................76 Removal and installation..................77 Turbocharger weights....................77 Removing the turbocharger..................
Operation Manual This Operation Manual helps familiarise the user with the turbocharger from ABB Turbocharging and how to use it as intended. It provides important information in order that the turbocharger can be operated safely, correctly and efficiently.
Operation Manual / TPL65-A10 / -A30 1 Preliminary remarks / 1.2 Layout and function 1.2 Layout and function 01Filter silencer 08Nozzle ring 02Radial plain bearing 09Turbine wheel 03Thrust bearing 10Bearing casing 04Bearing bush 11Diffuser 05Radial plain bearing 12Compressor wheel 06Gas outlet casing...
Page 7
Operation Manual / TPL65-A10 / -A30 1 Preliminary remarks / 1.2 Layout and function Mode of operation The turbocharger is a turbomachine and consists of the following main components: ¡ Turbine ¡ Compressor These are both mounted on a common shaft.
Any other use is considered to be a special application, which must first be clarified with ABB Turbocharging. The manufacturer accepts no liab- ility for any other type of use. If the equipment is used for any other purpose, ABB Turbocharging reserves the right to reject all warranty claims.
1.4 Storage of new turbochargers and spare parts Storage of new turbochargers and spare parts up to 6 months New turbochargers and spare parts from ABB Turbocharging can be stored in sealed packaging without additional mothballing measures for up to 6 months from the date of delivery (marked by the VCI label on the package).
Page 10
Seal the package. The better the external seal is designed, the more permanent the protection. Long-term storage of turbochargers The turbochargers will be prepared for prolonged storage by ABB Tur- bocharging on request. The package is equipped with a hygrometer (see illustration).
Page 12
Only use original parts from ABB. ABB accepts no liability for any damage resulting from the use of non- original parts and corresponding accessories. Competence of personnel The turbocharger must only be operated and serviced by trained and au- thorised personnel.
Page 13
This document is valid for different design variants of turbochargers. There may be sections and descriptions of components that are not rel- evant for a specific turbocharger variant. ABB Turbocharging Service Stations will be happy to provide information on questions regarding a design variant (see Contact information at www.abb.com/turbocharging).
A rating plate is attached to the turbocharger foot, one on the left and one on the right. On turbochargers with insulation from ABB, at least one additional rating plate is attached to the insulation of the gas outlet cas- ing.
2 Safety / 2.1 Introduction 2 Safety 2.1 Introduction Turbochargers manufactured by ABB are state of the art and comply with the pertinent safety and health-protection requirements that ap- plied when the turbocharger was manufactured. Consequently, the tur- bocharger is safe to operate. Nevertheless, during turbocharger opera-...
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.3 Definition of mandatory signs 2.3 Definition of mandatory signs To be worn at all times Protective clothing Safety footwear to pro- tect against mechanical hazard and risk of fall- To be worn according to the specific work...
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.5 Warning plates on the turbocharger 2.5 Warning plates on the turbocharger Warning plates that must be observed are attached to the turbocharger. The warning plates must always be present in the intended locations and must be legible.
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance 2.6 Safe operation and maintenance The instructions specified in this section are for the safety of personnel. Together with the instructions in the Hazards during operation and maintenance section, they allow the user to safely use the turbocharger.
Page 21
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance Safety during start-up / commissioning and operation Before starting work, carry out visual inspection of working area. Remove any obstacles and objects lying around. Before start-up / commissioning, check all pipes from and to tur- bocharger for damage and leaks.
Page 22
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance Safety during disassembly, assembly, maintenance and troubleshooting Always perform the specified adjustments, servicing as well as in- spection work and observe inspection intervals. Inform operating personnel about all service and repair work before beginning.
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance 2.7 Hazards during operation and maintenance Mechanical hazards during operation During normal operation, no mechanical hazards emanate from the tur- bocharger if it has been installed properly.
Page 24
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance Hazards due to noise The development of noise during operation is influenced by the installa- tion and operating conditions. Noise with a sound pressure level exceed- ing 85 dB(A) is harmful.
Page 25
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance WARNING Hot surfaces on uninsulated turbochargers Uninsulated turbochargers can cause serious personal injuries (burns). The turbocharger is supplied with or without insulation in accordance with the purchase order received from the enginebuilder. If supply is...
Page 26
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance WARNING Risk of fire, explosion Flammable and combustible operating materials and supplies can catch fire or resulting vapours can lead to an explosion. Observe the details in the material safety data sheets of the operat- ing and auxiliary materials.
Page 27
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance Hazards when handling insulating materials WARNING Hazards due to insulating materials Dust and fibres from insulating materials can cause damage to health or irritations. Unsuitable, combustible insulating materials signify a fire hazard.
Heed any country-specific regulations. 2.8 Periodic checking of the pressure vessel The pressure vessels used by ABB, such as those for wet or dry cleaning, are so-called "simple pressure vessels". ¡ The locally applicable legal regulations regarding periodic checks of the pressure vessels must be observed.
Page 29
Operation Manual / TPL65-A10 / -A30 2 Safety / 2.9 Lifting loads In the case of two or more suspension points, the slinging angle must not exceed 45°. This avoids excessive loading due to inclined tensile loading. Fasten turbocharger assemblies / components as described in re- spective handling steps.
Operation Manual / TPL65-A10 / -A30 3 Start-up / 3.1 Oil supply 3 Start-up 3.1 Oil supply A carefully designed and installed oil supply, which functions in all pos- sible operational conditions, is an important prerequisite for trouble- free turbocharger operation.
Page 31
Operation Manual / TPL65-A10 / -A30 3 Start-up / 3.1 Oil supply Oil pressure The oil pressure in front of the turbocharger must be maintained pre- cisely to ensure trouble-free operation. The permissible oil pressure ranges at measuring point M (blind connec- tion) on the turbocharger are listed below.
Operation Manual / TPL65-A10 / -A30 3 Start-up / 3.2 Inspection work 3.2 Inspection work Inspection work includes preventive visual controls plus monitoring and measuring work before and during commissioning. Inspections help de- tect changes to the turbocharger. Machine damage can be avoided.
Page 34
Operation Manual / TPL65-A10 / -A30 3 Start-up / 3.2 Inspection work 3.2.2 Check after start-up (engine at idling speed) Lubricating system Check oil pressure in oil supply lines. Check oil inlet temperature. The permissible values are listed in the section Oil supply.
Operation Manual / TPL65-A10 / -A30 3 Start-up / 3.3 Commissioning after taking out of operation 3.3 Commissioning after taking out of operation If provided Remove cover plates (blind flanges) between compressor casing out- let and charge air duct, before gas inlet and after gas outlet.
NOTICE Service inspection after 5 years To prevent age- and stoppage-related machine damage, an inspection by an ABB Turbocharging Service Station is recommended at the latest 5 years after the last service. 4.2.1 Service work every 25 … 50 hours Visual inspection for air, exhaust gas, water and oil leaks.
Page 39
Operation Manual / TPL65-A10 / -A30 4 Operation / 4.2 Servicing work 4.2.2 Entries in engine logbook By monitoring the engine, conclusions can be drawn about the tur- bocharger performance. The following operating data and measured values must be entered reg- ularly in the engine manufacturer's engine logbook: ¡...
Page 40
Inspect and assess bearing parts and rotor. 4.2.5 Service work every 24000 … 36000 hours The replacement of bearing parts and the inspection and assessment of the rotor must be carried out by an ABB Turbocharging Service Station. Disassemble turbocharger. Clearance measurement.
Operation Manual / TPL65-A10 / -A30 4 Operation / 4.3 Replacement intervals for turbocharger components 4.3 Replacement intervals for turbocharger components Rotating components The recommended replacement intervals for the compressor and turbine wheels due to stress caused by centrifugal forces and load cycles are cal- culated under consideration of the operating conditions while applying the safety concept for rotating components.
Operation Manual / TPL65-A10 / -A30 4 Operation / 4.4 Speed measurement 4.4 Speed measurement A speed measuring system permits continuous monitoring of the tur- bocharger speed. CAUTION Do not use cables as a climbing aid If you pull the speed measurement cables too hard, contacts can be pulled out.
Page 44
If the engine can be stopped for a short time: Inspect the air and gas lines as well as the turbocharger and eliminate any problems. In any event, it is recommended that you contact the nearest ABB Tur- bocharging Service Station. 4.4.2 Assembly...
Page 45
Operation Manual / TPL65-A10 / -A30 4 Operation / 4.4 Speed measurement 4.4.3 Replacing the speed sensor WARNING Hot cable connector and hot speed sensor Risk of burning. During operation, the cable connector and the speed sensor can reach temperatures exceeding 100 °C.
Operation Manual / TPL65-A10 / -A30 4 Operation / 4.5 Stopping the engine 4.5 Stopping the engine CAUTION Stopping the engine Heat in the turbocharger must be dissipated by the further circulating lubricating oil. Allow the engine to continue running at idling speed for a further 10 minutes before stopping.
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.1 Foreword to Maintenance 5 Maintenance 5.1 Foreword to Maintenance Maintenance and servicing work involves regular visual checks and clean- ing to ensure that the turbocharger and its attached units function trouble-free.
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer 5.2 Cleaning the filter silencer 5.2.1 Filter silencer with tension band 81265 Filter ring (if provided) 81138 Sheet-metal covering 81270 Tension band 81005 Screw plug 81271...
Page 49
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer NOTICE The amount of filter ring (81265) contamination depends on the cleanli- ness of the air that is drawn in. Wash or replace the filter ring as neces- sary or every 500 hours of operation.
Page 51
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer Removing and cleaning filter silencer If provided Remove filter strip (81265). Rinse filter strip (81265) using water with detergent additive or, if very dirty, soak it and squeeze out carefully. Rinse it in cold water. Avoid rough treatment (not a jet of water).
Page 52
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer Fitting the filter silencer Assemble the insert units (E) by inserting the absorption segments (81136) into the sheet metal coverings (81137). Bend sheet metal coverings (81137) back to original shape.
Page 53
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer Join connecting rods (81269) using screws (81272). When tightening the screws (81272), ensure that connecting rods (81269) are located correctly in recesses in filter silencer body (81135). Now tighten...
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.3 Cleaning the compressor during operation 5.3 Cleaning the compressor during operation Approval by enginebuilder These instructions for wet cleaning only apply when cleaning is carried out with clean water and under the precondition that the enginebuilder approves the process.
Page 55
¡ Wet cleaning This cleaning method is tested and approved by ABB Turbocharging. Principle of wet cleaning To clean the compressor stage during operation, water is injected in front of the compressor wheel through an injection pipe fitted in the fil- ter silencer or the suction branch.
Page 56
Operating state prerequisites for wet cleaning XC3 NOTICE To be able to carry out a satisfactory cleaning process which has been tested and is recommended by ABB Turbocharging, the following pre- requisites must be fulfilled: Engine load 50 … 85% Start of cleaning cycle in accordance with following description for wet cleaning operation with XC3.
Page 57
If the cleaning result is still not satisfactory after three attempts and the engine values are also unsatisfactory, we recommend that you have the turbocharger inspected and cleaned by an official ABB Turbochar- ging Service Station. Cleaning parameters per turbocharger compressor...
Cleaning method When cleaning the turbine components during operation, use wet clean- ing. This cleaning method is tested and approved by ABB Turbocharging. Prerequisites for wet cleaning are that the enginebuilder approves the process and his instructions are followed.
Page 59
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera- tion ¡ Erosion The dirt is removed by the mechanical action of the impacting water droplets. ¡ Solubility Water solubility of the contamination deposits in water.
Page 60
Prerequisites for wet cleaning of turbine The following operating state and prerequisites have been tested and approved by ABB Turbocharging for the cleaning process: The engine has just been started or the engine load has been reduced as far as possible (best cleaning is achieved at a load level of roughly 10 … 15%).
Page 61
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera- tion Layout of cleaning pipes Wet cleaning procedure for turbine during operation Meet prerequisites and operating state requirements without fail be- fore cleaning! Make sure water supply (01) is connected, turned on and guaranteed.
Page 62
The maximum volume of water allowed in individual cases must be determined together with an ABB Turbocharging Service Station. The influence of the cleaning water on peripheral equipment, such as a boiler, must be clarified by the operator.
(see chapter entitled Service work). Professional overhauling of the components by an ABB Turbocharging Service Station is required, preferably using the cleaning method de- scribed in the following.
Page 64
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 5.5.2 Turbine-end, non-rotating parts WARNING Handling operating materials and supplies Swallowing or inhaling vapours of operating materials and supplies or contact with them may be harmful to health.
Page 65
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Repeat the soaking and brushing if necessary. Completely remove any solvents from the parts in clean water. Dry components completely. Spray cleaned surfaces with penetrating oil. Do not spray the outer surfaces of the turbocharger.
Page 66
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Dry the compressor wheel and the gap between the compressor and the bearing casing with a weak jet of compressed air. Lightly spray the gap between the compressor and the bearing casing with penetrating oil.
Page 67
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 1. Suspend cartridge group from normal suspension point and suspend from first crane. 2. Secure two lifting loops with swivel lifting eyes in the lower push-off threads and suspend from a second crane.
Page 68
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Cartridge group with two side suspension points Or use two swivel lifting eyes at top. CAUTION Damage to compressor wheel The lifting gear must not touch the compressor wheel at any time dur- ing rotation.
Page 69
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 4. When the cartridge group is suspended horizontally, attach a chain block to the swivel lifting eye and attach to the first crane. 5. Tighten chain block until entire cartridge group is suspended from first crane.
Page 70
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically NOTICE Heating the liquid To shorten the soaking time the liquid can be heated to maximum 60 ºC. WARNING Heating up of cleaning agents and operating fluids When cleaning agents or operating fluids are heated up, explosive va- pours can be produced which are hazardous to health.
Page 71
Operation Manual / TPL65-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Remove contamination manually with a soft brush or wire brush. CAUTION Water and contamination in the cartridge group If water or contamination gets into the cartridge group, the turbochar- ger function may be impaired and parts in the cartridge group may be damaged.
Prolonged or periodic surging Possible damage to components, such as the compressor wheel, tur- bine blades, bearings and filter silencer Have the cause clarified immediately by an ABB Turbocharging ser- vice station and rectified. Have components inspected for damage and, if necessary, replaced by an ABB Turbocharging service station.
Defective oil pump in lubricat- Check / replace it ing system Manometer display wrong Replace the manometer Turbochar- Rotor axial clearance too large Contact an ABB Turbocharging Service Station Reduction in speed Possible causes Elimination Engine Defects of connected cylinders...
Page 75
Operation Manual / TPL65-A10 / -A30 6 Troubleshooting / 6.3 Malfunctions during operation Exhaust gas temperature too high Engine performance and engine speed unchanged Possible causes Elimination Engine Malfunctioning injection Repair it or contact the manu- system facturer Turbocharger Air starvation, for example...
Page 76
Operation Manual / TPL65-A10 / -A30 6 Troubleshooting / 6.3 Malfunctions during operation Charge air pressure too low Engine performance and engine speed unchanged, air intake condition normal Possible causes Elimination Engine Air receiver leaking Make repairs Gas piping between the engine...
Operation Manual / TPL65-A10 / -A30 6 Troubleshooting / 6.4 Malfunctions when stopping 6.4 Malfunctions when stopping Noises during run-down Possible causes Elimination Turbochar- Turbocharger contaminated Clean it Damaged bearing Contact an ABB Turbocharging Service Station Rubbing rotor Foreign object in turbocharger...
Operation Manual / TPL65-A10 / -A30 6 Troubleshooting / 6.5 Speed measurement system 6.5 Speed measurement system Possible causes Elimination Signal amp- Fitting error The screw plug for the sensor is fitted with litude non ex- a gasket. istent or poor When fitting the speed sensor, this gasket must be removed.
Operation Manual / TPL65-A10 / -A30 7 Removal and installation / 7.1 Turbocharger weights 7 Removal and installation 7.1 Turbocharger weights Lifting gear with a sufficient load limit must be used for removing and installing the turbocharger. The following weight specification is the heaviest variant possible.
Operation Manual / TPL65-A10 / -A30 7 Removal and installation / 7.2 Removing the turbocharger 7.2 Removing the turbocharger Disconnect all gas, air and oil lines in accordance with the engineb- uilder’s instructions. CAUTION Oil orifices There is an orifice for adjusting the oil pressure in each of the two oil supply pipes of the bearing casing.
Page 81
Operation Manual / TPL65-A10 / -A30 7 Removal and installation / 7.2 Removing the turbocharger Ribs (01) not in the middle at the top: Completely remove the bearing casing insulation (02) and place a sling around the bearing casing. Loosen the fixing screws at the foot.
Operation Manual / TPL65-A10 / -A30 7 Removal and installation / 7.3 Installing the turbocharger 7.3 Installing the turbocharger Remove cover from oil connection. Inspect lifting gear. Fasten lifting gear to each of two bearing casing ribs provided for this purpose.
For safety and product liability reasons, work on the cartridge group that is not described in the operation manual should only be carried out by trained specialists at an ABB Turbocharging Service Station. Unqualified work on the cartridge group can lead to total system failure and void the warranty.
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.2 Module weights 8.2 Module weights The specified weights of individual parts or assemblies are guides roun- ded off to the next highest value. Assemblies Weights [kg] Description TPL65...
Page 86
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.2 Module weights Complete compressor casing Weights [kg] TPL65 NOTICE The total weight of the complete compressor casing is an addition of the weights of the compressor casing, the diffuser and the wall insert.
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.3 Removing and fitting filter silencer or air suction branch 8.3 Removing and fitting filter silencer or air suction branch Removing the air suction Disconnect all air lines in accordance with the engine builder’s instruc- branch tions.
Page 88
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.3 Removing and fitting filter silencer or air suction branch Remove filter silencer. Remove insulation where necessary. Fit swivel lifting eye (90231) to filter silencer. Pass lifting gear through rib on filter silencer.
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.5 Removing cartridge group 8.5 Removing cartridge group Remove insulation. Disconnect oil lines in accordance with engine manufacturer's instruc- tions. CAUTION Oil orifices There is an orifice for adjusting the oil pressure in each of the two oil supply pipes of the bearing casing.
Page 91
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.5 Removing cartridge group Turn compressor casing (72000) together with wall insert and dif- fuser and set them down with surface (F) on underlay. WARNING Tipping the compressor casing Make sure that the underlay does not slip.
Page 92
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.5 Removing cartridge group Unplug cable connector (86515) and unscrew speed sensor (86505) with O-ring (86506). Remove the O-ring (42012). Remove the three screws (61059) together with their Verbus Ripp®...
Page 93
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.5 Removing cartridge group Withdraw cartridge group and fit supports (90450). Remove screws (42054) together with flange (42044) and also remove possible contamination behind the flange. Cover the oil connections.
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring 8.6 Dismantling and installing the turbine diffuser and nozzle ring CAUTION Falling nozzle ring The nozzle ring hangs only loosely on the positioning pins.
Page 95
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Position clamp (90921) over stud (61036) until it lies flat against inner radius of gas outlet casing. Insert extension (A) of torque spanner (B) through clamp hole and only loosen screws (61056) one after other.
Page 96
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Replace two screws (61056) in the gas outlet casing with two guide studs (90320) in the upper section of the turbine diffuser (63000).
Page 97
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Installing the turbine diffuser and nozzle ring Install the nozzle ring and turbine diffuser in the reverse order of re- moval.
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.7 Installing cartridge group 8.7 Installing cartridge group CAUTION Oil orifices There is an orifice for adjusting the oil pressure in each of the two oil supply pipes of the bearing casing. When the cartridge group, the bear-...
Page 99
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.7 Installing cartridge group CAUTION If there is no or insufficient clearance between the rotor turbine blades and the turbine diffuser, the blades and the turbine diffuser (casing) can be damaged.
Clearances out of tolerance and excessively worn components can be the cause of serious damage to machinery and property. Have components assessed and, if necessary, replaced by an ABB Turbocharging Service Station. Connect oil lines and all air lines in accordance with engine builder’s instructions.
Page 101
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Removing nozzle ring Remove insulation from gas inlet casing (51001). Loop rope around gas inlet casing and secure with lifting gear.
Page 102
Operation Manual / TPL65-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end CAUTION When setting down the gas inlet casing to one side, use suitable under- lays and take care not to damage the brackets of the insulation.
45% of n . Take note of the rating plate. Bmax After locking the turbocharger, contact an ABB Turbocharging Ser- vice Station and find the nearest port. Observe the safety regulations. Follow the directives of the enginebuilder.
Operation Manual / TPL65-A10 / -A30 9 Taking out of operation at short notice / 9.2 Fit cover plate 9.2 Fit cover plate NOTICE The cover plate (material: General structural steel, in accordance with DIN EN 10025-2) must be manufactured in-house according to the drawing.
Page 108
Operation Manual / TPL65-A10 / -A30 9 Taking out of operation at short notice / 9.2 Fit cover plate Close off opening in gas outlet casing using cover plate. Fasten cover plate using spacer sleeves and nuts (61037). CAUTION Shut off the supply of lubricating oil to the turbocharger.
Page 109
Operation Manual / TPL65-A10 / -A30 9 Taking out of operation at short notice / 9.2 Fit cover plate Further measures and information for operation with a turbocharger with cover plate on 4-stroke engines 4-stroke engine with one turbocharger No further measures are necessary. The engine can be operated as a nat- urally-aspirated engine according to the engine builder's instructions.
Operation Manual / TPL65-A10 / -A30 9 Taking out of operation at short notice / 9.3 Blocking the inlets and outlets 9.3 Blocking the inlets and outlets CAUTION Shut off the lubricating oil supply to the turbocharger. Shut off compressor casing outlet, gas inlet and gas outlet by fitting cover plates.
Operation Manual / TPL65-A10 / -A30 10 Mothballing the turbocharger / 10.1 Taking the engine out of opera- tion for up to 12 months 10 Mothballing the turbocharger 10.1 Taking the engine out of operation for up to 12 months Condition of engine lubricating oil The turbocharger normally remains mounted on the engine.
Page 112
Dismantle the turbocharger. The rotor and the bearing parts must be removed by an official ABB Turbocharging service station and refitted afterwards. Clean all parts. Machined, bright surfaces of steel and cast parts must be oiled with anticorrosive oil.
Operation Manual / TPL65-A10 / -A30 10 Mothballing the turbocharger / 10.2 Taking the engine out of oper- ation for more than 12 months 10.2 Taking the engine out of operation for more than 12 months If the engine is taken out of operation, the following variants are pos- sible with regard to the turbocharger: ¡...
Operation Manual / TPL65-A10 / -A30 11 Disposing of turbocharger components / 11 Disposing of turbocharger components WARNING Handling damaged thermal insulation Damaged thermal insulation can lead to dust exposure. The glass fibres can cause mechanical irritation of the eyes, skin, and respiratory tracts.
Serial number (HT……) ¡ Designation and part number. Spare parts can be ordered from an official ABB Turbocharging service station. If different design versions have not been taken into consideration in this document, please contact an ABB Turbocharging service station.
Page 116
CAUTION Leaks Improper assembly of the cleaning pipe and the nozzles can lead to leaks and failure of the turbine cleaning system. Have work on the turbine cleaning system carried out by an ABB Tur- bocharging Service Station. Quantity Description...
Page 118
Operation Manual / TPL65-A10 / -A30 12 Spare parts / 12.2 View of the turbocharger with part numbers Part number Description – Cartridge group 51001 Gas inlet casing 56001 Nozzle ring 61001 Gas outlet casing 61036 Stud 61043 (in customer spare part Verbus Ripp®...
Operation Manual / TPL65-A10 / -A30 12 Spare parts / 12.3 View of turbine cleaning system with part num- bers (optional) 12.3 View of turbine cleaning system with part numbers (optional) Part number Description 51229 Cleaning pipe 52249 Holder complete...