8.13. Remove the Contact metals
1. Remove the Cabinet assy. (See section 8.12.)
2. Remove the Tape from the Contact metals.
3. Remove the screws (×8
4. Remove the Contact metal side (L, R).
5. Remove the screws (×6
6. Remove the Contact metal top.
7. Remove the screws (×15
8. Remove the Contact metal bottom A.
8.14. Remove the C1-Board
1. Remove the Contact metal bottom A. (See section 8.13.)
2. Disconnect the flexible cables (CB1, CB2, CB3, CB4,
CB5, CB6 and CB7).
3. Disconnect the flexible cables (C10 and C11).
4. Remove the screws (×4
).
).
).
) and remove the C1-Board.
8.15. Remove the C2-Board
1. Remove the Contact metal bottom A. (See section 8.13.)
2. Disconnect the flexible cables (CB8, CB9, CB10, CB11,
CB12, CB13, CB14 and CB15).
3. Disconnect the flexible cables (C20, C21 and C23).
4. Disconnect the connector (C25).
5. Remove the screws (×4
8.16. Remove the K-Board
1. Remove the Contact metal bottom B. (See section 8.11.)
2. Remove the claw (×1
3. Disconnect the connector (K1) and Remove the K-Board
from LED Panel.
8.17. Replace the Plasma panel
Caution:
Place the Plasma panel on a flat surface of a table (cov-
ered by a soft cloth) and a cushion.
A new plasma panel itself without Contact metals is fragile.
To avoid the damage to new plasma panel, carry a new
plasma panel taking hold of the Contact metals.
1. Place a carton box packed a new plasma panel on the flat
surface of the work bench.
2. Open a box and without taking a new plasma panel.
3. Attach the cabinet assy and each P.C.Board and so on, to
the new plasma panel.
24
) and remove the C2-Board.
).