hit counter script

Operation; Cooling Sequence Of Operation; Additional Static Resistance - York ZF150 Installation Manual

Hide thumbs Also See for ZF150:
Table of Contents

Advertisement

Table 21: Additional Static Resistance
Size
Model
CFM
(Tons)
1900
2100
2300
2500
2700
2900
3100
078 (6.5)
ZF
090 (7.5)
3300
3500
3700
3900
4100
4300
4500
1900
2100
2300
2500
2700
2900
3100
3300
3500
3700
3900
102 (8.5)
120 (10)
ZF
4100
150 (12.5)
4300
4500
4700
4900
5100
5300
5500
5700
5900
6100
6300
1. Add these values to the available static resistance in the respective Blower Performance Tables.
2. Deduct these values from the available external static pressure shown in the respective Blower Performance Tables.
3. The pressure drop through the economizer is greater for 100% outdoor air than for 100% return air. If the resistance of the return air duct is
less than 0.25 IWG, the unit will deliver less CFM during full economizer operation.

Operation

Cooling Sequence Of Operation

®
For the Predator
series of units, the thermostat makes a circuit
between "R" and "Y1" for the first stage of cooling.
The call is passed to the Unit Control Board (UCB), which
then determines whether the requested operation is available
and, if so, which components to energize.
Johnson Controls Unitary Products
1
Cooling Only
Economizer
0.00
-0.01
-0.01
-0.02
-0.03
-0.04
-0.05
-0.06
-0.07
-0.08
-0.09
-0.09
-0.10
-0.11
0.06
0.07
0.08
0.09
0.11
0.12
0.14
0.16
0.18
0.20
0.23
0.25
0.28
0.30
0.33
0.36
0.39
0.42
0.45
0.48
0.52
0.56
0.60
,
2
3
2
4" Filter
0.07
0.10
0.09
0.11
0.11
0.12
0.13
0.14
0.16
0.15
0.18
0.16
0.20
0.18
0.22
0.19
0.24
0.20
0.27
0.21
0.29
0.23
0.31
0.24
0.30
0.25
0.35
0.26
0.02
0.12
0.02
0.13
0.02
0.14
0.02
0.16
0.03
0.17
0.03
0.19
0.03
0.20
0.03
0.22
0.04
0.26
0.04
0.27
0.04
0.29
0.04
0.32
0.05
0.35
0.05
0.38
0.05
0.41
0.05
0.44
0.06
0.47
0.06
0.51
0.06
0.55
0.06
0.58
0.07
0.62
0.07
0.67
0.07
0.71
For gas heating, the UCB monitors the "W1" call but does not
handle the operation of the gas furnace. An ignition control
board controls the gas heater operation. For electric heat units,
the UCB passes the call to the electric heater. In both cases,
when the "W1" call is sensed, the indoor air blower is energized
following a specified heating delay.
If at any time a call for both heating and cooling are present, the
heating operation will be performed. If operating, the cooling
system is halted as with a completion of a call for cooling.
Heating always takes priority.
Electric Heat kW
9
18
24
0.05
0.06
0.07
0.06
0.07
0.08
0.07
0.08
0.09
0.08
0.09
0.10
0.09
0.10
0.12
0.10
0.11
0.13
0.12
0.13
0.15
0.13
0.14
0.17
0.15
0.16
0.19
0.17
0.18
0.21
0.19
0.20
0.23
0.21
0.22
0.25
0.23
0.24
0.28
0.25
0.26
0.30
0.05
0.06
0.07
0.06
0.07
0.08
0.07
0.08
0.09
0.08
0.09
0.10
0.09
0.10
0.12
0.10
0.11
0.13
0.12
0.13
0.15
0.13
0.14
0.17
0.15
0.16
0.19
0.17
0.18
0.21
0.19
0.20
0.23
0.21
0.22
0.25
0.23
0.24
0.28
0.25
0.26
0.30
0.28
0.29
0.33
0.30
0.31
0.35
0.33
0.34
0.38
0.35
0.37
0.41
0.38
0.40
0.44
0.41
0.43
0.47
0.44
0.46
0.50
0.47
0.49
0.53
0.50
0.53
0.56
518674-YIM-C-0610
2
36
54
0.08
0.10
0.09
0.11
0.10
0.13
0.11
0.14
0.13
0.16
0.14
0.18
0.16
0.20
0.18
0.22
0.20
0.24
0.22
0.26
0.24
0.28
0.26
0.31
0.29
0.34
0.31
0.37
0.08
0.10
0.09
0.11
0.10
0.13
0.11
0.14
0.13
0.16
0.14
0.18
0.16
0.20
0.18
0.22
0.20
0.24
0.22
0.26
0.24
0.28
0.26
0.31
0.29
0.34
0.31
0.37
0.34
0.40
0.37
0.43
0.40
0.46
0.43
0.49
0.46
0.53
0.49
0.56
0.53
0.59
0.56
0.62
0.59
0.65
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf120Zf seriesZf102Zf090Zf078Predator zf series ... Show all

Table of Contents