hit counter script
Asus BE24ECSNK Service Manual
Hide thumbs Also See for BE24ECSNK:

Advertisement

Monitor Service Manual
Model: BE24ECSNK
Version no.: 0
Release date: 2024/4/10

Advertisement

Table of Contents
loading

Summary of Contents for Asus BE24ECSNK

  • Page 1 Monitor Service Manual Model: BE24ECSNK Version no.: 0 Release date: 2024/4/10...
  • Page 2 ASUS will only be responsible for or indemnify you for loss, damages or claims based in contract, tort or infringement under this Warranty Statement. This limit also applies to ASUS’ suppliers and its reseller. It is the maximum for which ASUS, its suppliers, and your reseller are collectively responsible.
  • Page 3: Table Of Contents

    Table of Contents 1. Safety Precautions ......................4 2. Exploded View ........................5 3. Disassembly and Assembly Procedures................ 6 Disassembly SOP ...................... 6 Assembly SOP ......................11 4. Trouble Shooting ......................17...
  • Page 4: Safety Precautions

    1. Safety Precautions FOR PRODUCTS CONTAINING LASER: DANGER- Invisible laser radiation when open. AVOID DIRECT EXPOSURE TO BEAM. CAUTION- Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure. CAUTION- The use of optical instruments with this product will increase eye hazard. TO ENSURE THE CONTINUED RELIABILITY OF THIS PRODUCT, USE ONLY ORIGINAL MANUFACTURER'S REPLACEMENT PARTS, WHICH ARE LISTED WITH THEIR PART NUMBERS IN THE PARTS LIST SECTION OF THIS SERVICE MANUAL...
  • Page 5: Exploded View

    2. Exploded View Note: For latest P/N, please refer to RSPL (Order Book System) Item Item Description Q'ty Description Q'ty MIDDLE FRAME BASE ASSY PANEL ASSY FC WEB CAM C624DQ #SCRW MACH FLATM3*0.5P*4.5L ZN WEBCAM BOARD KEY BOARD ASSY WIRE HINGE BE279ACSBK #SCRW TP-B FPH M2*4L B-ZN SCRW TAP FPH M2.5*4.5L B-NI SPEAKER...
  • Page 6: Disassembly And Assembly Procedures

    3. Disassembly and Assembly Procedures Disassembly SOP Preparation before disassemble 1. Clean the room for disassemble 2. Identify the area for monitor 3. Check the position that the monitors be placed and the quantity of the monitor; prepare the area for material flow; according to the actual condition plan the disassemble layout 4.
  • Page 7 4. Disassemble Rear Case from monitor. 5. Tear off 2 Foil-tape from Panel and disinsert camera cable from Main Board. 6. Unlock 2 screws and disassemble camera Torque : from Rear Case. 4.5±0.5 Kg-cm Screw: (SCRW TAP CAP M3*6L B- 1.
  • Page 8 3. Tear off 1 tape. 4. Pull the wire from Camera Board. 5. Remove Camera Board from hinge. 1. Tear off Mylar and disinsert Key Board wire from Main Board. 2. Tear off 2 tapes from lamp wire & Speaker then disassemble cable from Main Board.
  • Page 9 5. Unlock 9 Middle Frame screws. Screw: Torque : (#SCRW MACH 7.0±0.5 Kg-cm FLATM3*0.5P*4.5L ZN) 6. Disassemble Shielding from panel. 1. Disassemble Middle Frame from Panel. 2. Disassemble Speaker from Middle Frame. Torque : Screw 7.0±0.5 Kg-cm driver 3. Remove tape and unlock 3 screws to remove Key Board.
  • Page 10 2. Disassemble Mylar and wire from Shielding. Main Board 3. Unlock 6 PCBA screws and disassemble Main Power Board Main Board Board and Power Board Torque : from Shielding. 5.0±0.5 Kg-cm Screw: (#SCRW PH INT/TOO M3*9TP-S C-ZN) Power Board Main Board 4.
  • Page 11: Assembly Sop

    3.2 Assembly SOP Preparation before assemble 1. Clean the room for work 2. Identify the area for material 3. Prepare the implement, equipment and materials as bellow: 1) Working table 2) Screw-driver 3) Glove 4) Cleaning cloth 5) ESD protection After unplugging the power cord, the power board still have power energe.
  • Page 12 4. Lock 1 screws on the Shielding and paste 2 safety mylar on the Shielding. Screw: Torque : (SCRW TP-S FPH 5.0±0.5 Kg-cm M3*6(6/1.3) BZN) 1. Insert camera cable into camera Board. 2. Assemble camera Board to camera Shielding. Screw Driver 3.
  • Page 13 4. Assemble camera Shielding to front camera cover and lock 2 screws Torque : Screw: 4.0±0.5 (SCRW TAP FPH Kg-cm M2.5*4.5L B-NI) Torque : 5. Assemble camera 4.5±0.5 cover Kg-cm 6. Lock 2 screws. Screw: (SCREW M3*4 B) 7. Assemble camera to Torque : Rear Case and lock 2 4.5±0.5...
  • Page 14 2. Assemble Speaker to Middle Frame. 3. Insert LVDS cable into Panel and locate Shielding to Middle Frame 4. Lock 9 Middle Frame screws. Screw: Torque : (#SCRW MACH 7.0±0.5 Kg-cm FLATM3*0.5P*4.5L ZN) 5. Insert Key Board cable to Main Board. 6.
  • Page 15 1. Insert camera cable to Main Board and paste 1 Foil-tape. 2. Paste 1 safety myalr to fix camera cable. Screw 3. Assemble Rear Case drive to monitor and lock 4 Torque : screws. 8~10 Kg- Screw: (#SCRW FPHM4*10L(7.7/1.6)B- ZNNY) 4.
  • Page 16 1. Assemble Stand to Rear Case. 2. Finish...
  • Page 17: Trouble Shooting

    4. Trouble Shooting...

Table of Contents